My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
33 (STATE ROUTE 33)
>
35100
>
2900 - Site Mitigation Program
>
PR0506447
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2024 8:59:35 AM
Creation date
6/25/2020 3:59:22 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0506447
PE
2960
FACILITY_ID
FA0007429
FACILITY_NAME
CROP PRODUCTION SERVICES VERNALIS FACILITY
STREET_NUMBER
35100
Direction
S
STREET_NAME
STATE ROUTE 33
City
VERNALIS
Zip
95385
APN
25518008
CURRENT_STATUS
01
SITE_LOCATION
35100 S HWY 33
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9000030A11 CON-3 <br /> TABLE OF CONTENTS <br /> Section Page <br /> 1.0 INTRODUCTION 1-1 <br /> 1.1 Background 1-1 <br /> 1.2 Scope of Services 1-1 <br /> 1.3 Limitations 1-2 <br /> 2.0 SITE INSPECTION 2-1 <br /> 2. 1 Site Location and General Operations 2-1 <br /> 2.2 Inventory of Bulk Storage 2-6 <br /> 2.3 Suspected Site Contamination 2-9 <br /> 3.0 RECOMMENDATIONS FOR FURTHER INVESTIGATION 3-1 <br /> 3.1 Soil Sampling Program 3-1 <br /> 3.2 Soil Sampling Locations 3-1 <br /> 3.3 Soil Sampling Methods 3-8 <br /> 3.4 Water Supply Well Sampling 3-8 <br /> 3.5 Other Considerations 3-9 <br /> 4.0 ANALYTICAL PARAMETERS 4-1 <br /> 4.1 Fertilizer Parameters 4-1 <br /> 4.2 Pesticide Parameters 4-3 <br /> 4.3 Waste Oil Parameters 4-4 <br /> 4.4 Quality Assurance/Quality Control 4-4 <br /> 5.0 DATA INTERPRETATION AND PREPARATION OF REPORT 5-1 <br /> 5.1 Data Analysis 5-1 <br /> 5.2 Preparation of Draft and Final Reports 5-2 <br /> 6.0 ESTIMATED SCHEDULE 6-1 <br /> ii <br />
The URL can be used to link to this page
Your browser does not support the video tag.