Laserfiche WebLink
Raney Geotechnical,Inc. Project: CABRAL PROPERTY <br /> 3140 Beacon Blvd Project Number: 1828-092.01 Reported: <br /> West Sacramento CA,95691 Project Manager: Peter Ruttan 10/27/05 10:49 <br /> Metals by EPA 6010B- Quality Control <br /> SunStar Laboratories,Inc. <br /> Reporting Spike Source %REC RPD <br /> Analyte Result Limit Units Level Result %REC Limits RPD Limit Notes <br /> Batch 5102118-EPA 3051 <br /> Blank(5102118-BLK1) Prepared: 10/21/05 Analyzed: 10/25/05 <br /> Lead ND 3.0 mg/kg <br /> LCS(5102118-BSI) Prepared: 10/21/05 Analyzed: 10/25/05 <br /> Lead 106 3.0 mg/kg 100 106 75-125 <br /> Matrix Spike(.5102118-MS1) Source:T501244-01 Prepared: 10/21/05 Analyzed: 10/25/05 <br /> Lead 109 3.0 mg/kg 100 14 95.0 75-125 <br /> Matrix Spike Dup(5102118-MSDI) Source:T501244-01 Prepared: 10/21/05 Analyzed: 10/25/05 <br /> Lead 113 3.0 mg/kg 100 14 99.0 75-125 3.60 20 <br /> SunStar Laboratories, Inc. The results in this report apply to the samples analyzed in accordance with the chain of <br /> custody document.This analytical report must be reproduced in its entirety. <br /> John Shepler, Laboratory Director Page 10 of 12 <br />