My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
3515
>
2200 - Hazardous Waste Program
>
PR0514502
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2020 6:00:52 PM
Creation date
6/26/2020 12:43:23 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0514502
PE
2228
FACILITY_ID
FA0003747
FACILITY_NAME
Shell Oil Products US - Stockton Terminal
STREET_NUMBER
3515
STREET_NAME
NAVY
STREET_TYPE
Dr
City
Stockton
Zip
95203
APN
161-030-02
CURRENT_STATUS
01
SITE_LOCATION
3515 Navy Dr
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
775
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:05EFDA32-4C8F-4F23-93BC-D19E217654E0 <br /> SECTION IV—SCOPE DESCRIPTION <br /> The services for the mitigation of environmental impact caused by hazardous substance shall include <br /> but not be limited to the following: <br /> • Containment, neutralization decontamination recover, cleanup and repackaging of materials; <br /> • Site assessment and site restoration; <br /> • Transportation storage treatment or disposal of waste; <br /> • Engineering and technical services, including sampling analysis, design, engineering, construction; <br /> or any other related services; <br /> • Environmental consulting, preparedness evaluation, or any other related consulting services. <br /> • Site safety services as requested. <br /> Upon notice from Company of a spill or response need, Contractor shall immediately notify <br /> Company of Contractor ability to provide an immediate response, however if an immediate response is <br /> not possible then Contractor shall notify company within a time agreed to by both parties. Contractor <br /> shall perform the work in accordance with the terms and conditions set forth in this Agreement and any <br /> Orden at such places described by Company, and Company shall pay Contractor for the work actually <br /> performed in accordance with tens set forth in this Agreement and the relevant order.. <br /> Contractor shall maintain a 24 hour. 7 days a week telephone service to respond to emergency calls. <br /> Personnel will be dispatched to specified locations upon notification by authorized Company personnel. A <br /> first, second and third number and contact person will be available for every work location covered by <br /> this agreement. <br /> In performing the Contractor shall provide all necessary labor, supervision procurement and <br /> coordination of subcontractor work permits (except those provided by or in the name of Company), <br /> machinery, equipment tools, fuels, supplies (except those provided by Company) and transportation for <br /> the performance of the Work. <br /> Contractor shall maintain the appropriate United States Coast Guard Oil Spill Response Organization <br /> (OSRO) classification to respond to an incident at the specific Company facilities for which they have been <br /> identified. <br /> Contractor shall maintain a maximum 1-hour response time where identified as the primary response <br /> provider to meet regulatory requirements found in 40 CFR 112. <br /> Contractor shall provide evidence of OSRO classification as well as proof of equipment deployment <br /> exercises to the Company for assurance purpose annually. <br /> All materials and equipment furnished by the Contractor and ail Work performed by Contactor and its <br /> subcontractors shall be subject to inspection by company who shall have access at ail reasonable times, <br /> upon notice to Contractor and when accompanied by a representation of Contractor. Company's <br /> inspection shall not constitute acceptance of patent defects or relieve Contractor from any duties, <br /> obligations, or liabilities under this agreement associated with such defects. Neither company's review <br /> nor acceptance of Contractor's drawings, plans, or Wort specification, nor Company's monitoring of <br /> shall relieve Contractor of any obligations under thig agreement. <br /> Company shall have the right, but not the obligations to periodically review contractors operation for <br /> the purpose of monitoring Contractor compliance with the health. safety, security and environmental <br /> requirements. Such reviews shall not relieve the Contractor of its responsibility for protecting the safety <br /> and health of ail personnel nor shall they constitute an obligation on the part of Company to enforce <br /> compliance. Company shall have the right, but not the obligation, to request Contractors participation in <br /> training and drill exercises. <br /> Purchase Contract—GOODS and SERVICES <br /> Ver.2016a 25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.