Laserfiche WebLink
DocuSign Envelope ID:05EFDA32-4C8F-4F23-93BC-D19E217654E0 <br /> PERSONNEL INDUSTRIAL SERVICES <br /> LABOR STRAIGHT TIME OVERTIME PREMIUM TIME <br /> CODE DESCRIPTION PER HOUR PER HOUR PER HOUR <br /> SP Senior Project Manager 120.75 120.75 120.75 <br /> PM Project Manager 110.25 110.25 110.25 <br /> CH Chemist 110.25 110.25 110.25 <br /> HS Health &Safety Manager 89.25 99.75 99.75 <br /> HM Hazardous Material Specialist 68.25 84.00 99.75 <br /> FS Field Supervisor 63.00 78.75 94.50 <br /> HT Hazardous Material Technician 57.75 73.50 89.25 <br /> SF Site Foreman 53.50 67.00 84.75 <br /> RT Confined Space Rescue Technician 53.50 67.00 84.75 <br /> EO Equipment Operator 49.00 62.50 80.25 <br /> TD Truck Driver 49.00 62.50 80.25 <br /> TE Technician 44.75 58.00 75.75 <br /> Minium call out is 4 hours per person. <br /> Straight Time-Monday through Friday from 0700-1500, including chargeable 112 hour meal break. <br /> Overtime-All other hours Monday through Friday(up to 12 consecutive working hours)and the 1st 8 hours on Saturday. <br /> Premium Time-After 12 consecutive working hours Monday through Friday,all sebsequent hours on Saturday and All hours on <br /> Sunday&Holidays. <br /> Billing Rate in effect until a minimum 6 hour break is provided. <br /> Rate categories apply to personnel working during specified time of day regardless of the number of hours worked for the Client on <br /> that particular day. <br /> Notes: <br /> 1.Minimum call out for out of area projects is 8 hours per person. <br /> 2.Personnel time charges begin with equipment and personnel mobilization at the time of the call out. Time charges terminate at <br /> theconclusion of the operation, which includes transportation back to Patriot Environmental Operations Center and any necessary <br /> decontamination and/or repair of equipment. Personnel are charged in half-hour increments. <br /> 3.Outside services for any incidental costs for all emergency response personnel are charged at cost plus 10%. Per diem charges <br /> formeals are$35.00 per person per day. Crew lodging rates are$125.00 per person per day. For remote areas,higher rates may <br /> apply. <br /> 4.Surcharges may apply to cover unanticipated costs resulting from circumstances beyond the control of Patriot. <br /> 5.Commercial transportation for Patriot employees will be reimbursed at Patriot cost plus ten(10%). <br /> 6.Services shall be performed by employees of Patriot, or its subcontractors who will be controlled and under the sole authority <br /> ofPatriot,and who will be compensated for performance of the services directly by Patriot under the terms and conditions of their <br /> agreements with Patriot.Patriot will be responsible for the qualification of any subcontractors used to perform services on behalf of <br /> client. Client will be billed for services by Patriot's subcontractors at the greater of the rates listed in the Patriot Fee Schedule of <br /> Services or the cost of the subcontractor's services plus an administrative charge of ten percent(10%)of the cost of these services. <br /> Subcontractors'services will be listed on the Patriot Daily Work Report. Client agrees not to contact Patriot's subcontractors,directly or <br /> indirectly(including through agents), to attempt to secure the subcontractor's services for work to complete the Services,except <br /> through Patriot, or to seek to induce the Subcontractors to violate the terms of their agreements with Patriot. <br /> Purchase Contract-GOODS and SERVICES <br /> Ver.2016a 28 <br />