My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
3515
>
2200 - Hazardous Waste Program
>
PR0514502
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2020 6:00:52 PM
Creation date
6/26/2020 12:43:23 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0514502
PE
2228
FACILITY_ID
FA0003747
FACILITY_NAME
Shell Oil Products US - Stockton Terminal
STREET_NUMBER
3515
STREET_NAME
NAVY
STREET_TYPE
Dr
City
Stockton
Zip
95203
APN
161-030-02
CURRENT_STATUS
01
SITE_LOCATION
3515 Navy Dr
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
775
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:05EFDA32-4C8F-4F23-93BC-D19E217654E0 <br /> PERSONNEL INDUSTRIAL SERVICES <br /> LABOR STRAIGHT TIME OVERTIME PREMIUM TIME <br /> CODE DESCRIPTION PER HOUR PER HOUR PER HOUR <br /> SP Senior Project Manager 120.75 120.75 120.75 <br /> PM Project Manager 110.25 110.25 110.25 <br /> CH Chemist 110.25 110.25 110.25 <br /> HS Health &Safety Manager 89.25 99.75 99.75 <br /> HM Hazardous Material Specialist 68.25 84.00 99.75 <br /> FS Field Supervisor 63.00 78.75 94.50 <br /> HT Hazardous Material Technician 57.75 73.50 89.25 <br /> SF Site Foreman 53.50 67.00 84.75 <br /> RT Confined Space Rescue Technician 53.50 67.00 84.75 <br /> EO Equipment Operator 49.00 62.50 80.25 <br /> TD Truck Driver 49.00 62.50 80.25 <br /> TE Technician 44.75 58.00 75.75 <br /> Minium call out is 4 hours per person. <br /> Straight Time-Monday through Friday from 0700-1500, including chargeable 112 hour meal break. <br /> Overtime-All other hours Monday through Friday(up to 12 consecutive working hours)and the 1st 8 hours on Saturday. <br /> Premium Time-After 12 consecutive working hours Monday through Friday,all sebsequent hours on Saturday and All hours on <br /> Sunday&Holidays. <br /> Billing Rate in effect until a minimum 6 hour break is provided. <br /> Rate categories apply to personnel working during specified time of day regardless of the number of hours worked for the Client on <br /> that particular day. <br /> Notes: <br /> 1.Minimum call out for out of area projects is 8 hours per person. <br /> 2.Personnel time charges begin with equipment and personnel mobilization at the time of the call out. Time charges terminate at <br /> theconclusion of the operation, which includes transportation back to Patriot Environmental Operations Center and any necessary <br /> decontamination and/or repair of equipment. Personnel are charged in half-hour increments. <br /> 3.Outside services for any incidental costs for all emergency response personnel are charged at cost plus 10%. Per diem charges <br /> formeals are$35.00 per person per day. Crew lodging rates are$125.00 per person per day. For remote areas,higher rates may <br /> apply. <br /> 4.Surcharges may apply to cover unanticipated costs resulting from circumstances beyond the control of Patriot. <br /> 5.Commercial transportation for Patriot employees will be reimbursed at Patriot cost plus ten(10%). <br /> 6.Services shall be performed by employees of Patriot, or its subcontractors who will be controlled and under the sole authority <br /> ofPatriot,and who will be compensated for performance of the services directly by Patriot under the terms and conditions of their <br /> agreements with Patriot.Patriot will be responsible for the qualification of any subcontractors used to perform services on behalf of <br /> client. Client will be billed for services by Patriot's subcontractors at the greater of the rates listed in the Patriot Fee Schedule of <br /> Services or the cost of the subcontractor's services plus an administrative charge of ten percent(10%)of the cost of these services. <br /> Subcontractors'services will be listed on the Patriot Daily Work Report. Client agrees not to contact Patriot's subcontractors,directly or <br /> indirectly(including through agents), to attempt to secure the subcontractor's services for work to complete the Services,except <br /> through Patriot, or to seek to induce the Subcontractors to violate the terms of their agreements with Patriot. <br /> Purchase Contract-GOODS and SERVICES <br /> Ver.2016a 28 <br />
The URL can be used to link to this page
Your browser does not support the video tag.