Laserfiche WebLink
RAMP � I <br /> r� I <br /> z GATE <br /> I <br /> zw <br /> oY I <br /> U AC PVMT <br /> 18" HIGH 24 RAMOS OIL CO GATE I <br /> SUB DIKE <br /> INDUSTRIAL ROAD <br /> Other types of communication equipment <br /> GB I than listed below are personal cell phones <br /> AC PVMT and land lines located through out the office <br /> (RAMLEASED AREA (RAMOS OIL COMPANY)OS OIL COMPANY) ^I <br /> -- 14 �AP GATE RAMP PIPELINE WAREHOUSE LEGEND' <br /> � MANIFOLD <br /> ETHANOL <br /> A?EA D p 0 <br /> o 0 0 x¢I IS LIFT STATION <br /> ' 21 AP o Z O CONC. SK wwI J) UNDERGROUND STORAGE TANK <br /> G Q o SAB <br /> \ VRU VAPOR RECOVERY UNIT <br /> I \ C1 C8 CATCH BASIN <br /> I 0 1 3 * I SLIDING GATE <br /> 0 El 16 w OFFICE ° ° <br /> DI * PURE ® TRUCK LOADING RACK <br /> I C� O I J U <br /> Ix p D O m OD_�ALARM PNL PRIMARY PRODUCT PUMP(S) <br /> I 0 TANK FARM FIRE TRUCK RACK FIRE RED DYE FDC <br /> XFMR SUPPRESSION SUPPRESSION CHAIN LINK FENCING <br /> o STK 3 SYSTEM SYSTEM <br /> I Q POLE o ❑C.P. SOLAR CONC <br /> STK 5 DISCONNECT z o �� CONCRETE WALL OR CURBING <br /> 18 17 0 ® MCD N <br /> > ELIC <br /> D o STK R OVER EAD F ® EARTHEN OR COATED DIKE WALL <br /> I POLE(SOLAR) PIPE AY <br /> w w * w <br /> SEP:Fie VENT <br /> STAIRS <br /> 0 F F 2 <br /> ELEC ELECTRICAL SWITCHGEAR <br /> I * o GONG <br /> w <br /> SUPPLY E� ❑ ETHANOL UNLOADING PO PUMP OFF AREA <br /> PUMPS ° SLAB PUMPS <br /> I 19 2O GUARD POSTS EHANOL 2 TANK NO. 2 ETC... <br /> Ell L MI1 0 "o) (TYP 4) INJECTION SKIDS O ( ) <br /> VRU Io% <br /> O O POLE(SOLAR) / <br /> SCA TANK CY O SWING GATE <br /> ASPHALT PAVED HW HAZARDOUS WASTE DRUM STORAGE <br /> } <br /> MONITORING (O.O.S.) 11 Jt <br /> WELL NOTE 1 "w g EMERGENCY Shutdown <br /> O z�1 <br /> 47 w II Q FIRE ALARM PULL STATION <br /> IFH <br /> UNPAVED FH FIRE HYDRANT <br /> LS GA[E] ___�STORM WATER STORAGE I FDC Fire Department Connection <br /> DI SUMP RAMP (LEASED TO L& B) SK Spill Kit <br /> Discharge • POLE(SOLAR) <br /> AP Alarm Panel <br /> I GRAVEL * Fire Extinguishers <br /> ROAD <br /> NOTE 1: UG-5 IS EXEMPT FROM THE SPILL <br /> PREVENTION AND CONTROL (SPCC) PLAN. <br /> Refer to Appendix C for details on tanks, drums, & regulated oil filled equipment a roduct stored, containment volumes). �Terminal relies on OSRO for emergency30' 30' 60' <br /> pp 9 � J� p <br /> response equipment as facility has limited su I . (IN FEET) <br /> 9 03/15/18 AS-BUILT FOR BERM PROJECT LH WRM SJJ 4 8/7/09 ADDED LANE #3 FOR ETHANOL'S PUMP-OFF CA RAH RAH TRANSPORTATION TERMINALS <br /> 8 2/9/18 ADDED SOLAR ELECTRIC POLES & DISCONNECT JA YT WRM WRM 3 2/28/05 UPDATED TO ADD ETHANOL RACK AND NEW EQUIPMENT RELATED CIF STOCKTON TERMINAL GENERAL PLOT PLAN <br /> 7 9/1/17 BIODIESEL PROJECT UPDATE, ADD FH CIF WRM WRM 2 1/6/03 ADDED TANK 24 & STREAMLINED LEGEND ITEMS RWB RPK <br /> 6 7/15/16 AS-BUILT PER MOC-7455 BY SUN ENGINEERING MW BM TD 1 9/13/00 REV'D. TANK CHART/LEGEND DETAILS CEF THJ THJ THIS DOCUMENT IS CONFIDENTIAL aT SHALL NOT BE R OR <br /> REDISTRIBUTED WITHOUT PRIOR PERMISSION.N.NEITHER THE OPERATOATONOR NORR T THE OWNER <br /> 5 12/10/4 UPDATED AS PER FIELD MARKS FOR RESPONSE PLAN JAL TME TME 10 4/29/19 CHANGED TANK 21 COMMODITY FROM RUL TO PUL PER FACILITY ENGINEER MARK-UPS. MPJ MV MV MAKE ANY WARRANTY AS TO THE CORRECTNESS OR COMPLETENESS OF THE NFORMATION muE 1"=30'-0" MTL <br /> REV ELEC MECH REV ELEC MECH CONTAINED ON THIS DRAWING,AND THE USER ASSUMES ALL RISK OF LOSS TO P-1 0254 <br /> DATE DESCRIPTION OF REVISION ES N0. BY APP DATE DESCRIPTION OF RFV1510N FS N0. BY APP PERSONS AND PROPERTY AS A RESULT OF RELIANCE THEREON, 9RAWN MW 8/24/99 1 O <br /> 5/2/2019 P,.IAm ,, 3:10 PM <br />