Laserfiche WebLink
Internal Exercise Documentation Form <br /> (Semiannual) <br /> Equipment Deployment Exercise (Cont'd) <br /> 9. For deployment of OSRO - owned equipment, was a representative sample (at least <br /> 1000 feet of each boom type and at least one of each skimmer type) deployed❑ <br /> Was the equipment deployed in its intended operating environment- <br /> 10. Are all facility personnel that are responsible for response operations involved in a <br /> comprehensive training program, and all pollution response equipment involved in a <br /> comprehensive maintenance program <br /> If so, describe the program: <br /> Date of last equipment inspection: <br /> Inspection frequency: <br /> Last deployment drill date: <br /> Deployment frequency: <br /> 11. Was the equipment deployed by personnel responsible for its deployment in the event of <br /> an actual spill❑ <br /> 12. Was all deployed equipment operationalF If not, why not❑ <br /> 13. Oil Spill Removal Organization Certification (if applicable): <br /> Response Equipment Inspection Log <br /> Inspector Date Comments <br />