My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
3515
>
2200 - Hazardous Waste Program
>
PR0514502
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2020 6:00:52 PM
Creation date
6/26/2020 12:43:23 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0514502
PE
2228
FACILITY_ID
FA0003747
FACILITY_NAME
Shell Oil Products US - Stockton Terminal
STREET_NUMBER
3515
STREET_NAME
NAVY
STREET_TYPE
Dr
City
Stockton
Zip
95203
APN
161-030-02
CURRENT_STATUS
01
SITE_LOCATION
3515 Navy Dr
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
775
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Emergency Response Action Plan Version :27.10.4 <br /> Facility Response Equipment Comments <br /> Note 1 -The Facility maintains a minimal quantity of hand tools and absorbent material on-site that is <br /> to be used for routine maintenance operations only. The Company has arranged through Contract <br /> for listed OSROs to respond to an incident with necessary equipment within one (1) hour as detailed <br /> in Figure A.3. <br /> Note 2 - Equipment listed with no shelf life or N/A do not have a shelf life indicated by manufacturer. <br /> Note 3 - Equipment testing/inspections, preventive maintenance records, deployment records, and <br /> other relevant documentation are kept on file at the Facility separate from this document. Blank <br /> forms/logs are located in FRP Appendix H. <br /> Note 4 -The Plan Holder shall notify the Administrator when major equipment is removed from <br /> service for a period of twenty-four(24) hours or more for maintenance or repair. <br /> The Facility has no additional response equipment or other cleanup materials than listed above. <br /> Booming details along with access points are noted on the diagram found in in Section 6. Because <br /> of the Facility's location and the weather prone to the area (flooding, etc.), response times and <br /> deployments can be negatively impacted during a response; however, Facility trains towards such <br /> concerns. <br /> Shell Supply and Distribution ERAP-70 Stockton Terminal FRP <br /> ©2019 Witt O' Brien's Revision Date:October, 2019 <br />
The URL can be used to link to this page
Your browser does not support the video tag.