My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
STIMSON
>
2000
>
2900 - Site Mitigation Program
>
PR0009229
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/27/2020 8:05:45 AM
Creation date
6/26/2020 5:02:08 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0009229
PE
2960
FACILITY_ID
FA0004047
FACILITY_NAME
STOCKTON ARMY AIR SUPPORT FAC
STREET_NUMBER
2000
STREET_NAME
STIMSON
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
17726004
CURRENT_STATUS
01
SITE_LOCATION
2000 STIMSON ST
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
166
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Stream River Pond Lake— Bay_Ocean Other <br /> None_X_ <br /> Are the services being provided as a consequence of orders from local, state, or federal <br /> officials? <br /> Yes No <br /> 1.3 PURPOSE <br /> The primary purpose of the site safety plan is to provide Versar field personnel and <br /> subcontractors with an understanding of the potential chemical and physical hazards that exist or <br /> may arise while the tasks of this project are being performed. The site safety plan follows the <br /> guidelines set forth in the Corporate Health and Safety Manual; the Injury Illness and Prevention <br /> Program (11PP); and the Medical Monitoring Program. Additionally, the information contained <br /> herein will define the safety precautions necessary to respond to such hazards should they occur. <br /> 1.4 OBJECTIVE <br /> The primary objective of the site safety plan is to ensure the well being of field personnel and the <br /> community surrounding the Site. In order to accomplish this,project staff and approved <br /> subcontractors shall acknowledge and adhere to the policies and procedures established herein. <br /> Accordingly,personnel assigned to this project shall read this site safety plan and sign the <br /> Agreement Statement in Section 8.1 to certify that they have read,understood, and agreed to <br /> abide by its provisions. Versar personnel shall perform work in compliance with standards set <br /> forth in the Corporate Health and Safety Manual and the EPP. <br /> 1.5 HAZARD DETERIVIINATION <br /> Serious Moderate Low X Unknown <br /> 1.6 LEVEL OF PROTECTION <br /> X Modified level D <br /> The minimum acceptable level of protection at this Site is a Modified Level D, as described in <br /> Section 5.0 entitled "Health and Safety Requirements." <br /> 1.7 AMENDMENTS <br /> Any change in the scope of this project and/or Site conditions must be amended in writing in <br /> Section 8.2 entitled "Site Safety Plan Amendment Sheet" and approved by the Regional Health <br /> and Safety Officer. <br /> 3028-03/114700.4766.023/RJL?3'03 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.