My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
STIMSON
>
2000
>
2900 - Site Mitigation Program
>
PR0009229
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/27/2020 8:05:45 AM
Creation date
6/26/2020 5:02:08 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0009229
PE
2960
FACILITY_ID
FA0004047
FACILITY_NAME
STOCKTON ARMY AIR SUPPORT FAC
STREET_NUMBER
2000
STREET_NAME
STIMSON
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
17726004
CURRENT_STATUS
01
SITE_LOCATION
2000 STIMSON ST
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
166
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Work Plan for Groundwater Monitoring Well Installation, <br /> Soil Gas and Groundwater Investigation, <br /> and Groundwater Monitoring <br /> Army Aviation Support Facility, Stockton, California <br /> TABLE OF CONTENTS <br /> 1.0 INTRODUCTION...............................................................................................................1 <br /> 1.1 PROJECT OBJECTIVES AND SCOPE..................................................................................2 <br /> 1.2 SITE LOCATION...............................................................................................................3 <br /> 1.3 SITE DESCRIPTION AND HISTORY.....................................................................................3 <br /> 1.4 SITE SETTING AND GEOLOGY..........................................................................................4 <br /> 1.5 REGIONAL AND SITE HYDROGEOLOGY.............................................................................5 <br /> 1.6 CONCEPTUAL SITE MODEL..............................................................................................5 <br /> 2.0 PREVIOUS ENVIRONMENTAL INVESTIGATIONS........................................................5 <br /> 2.1 UST REMOVALS .............................................................................................................6 <br /> 2.2 PREVIOUS GROUNDWATER MONITORING.........................................................................6 <br /> 2.3 FEBRUARY 2004 SITE INVESTIGATION..............................................................................6 <br /> 2.4 MARCH 2008 SITE INVESTIGATION...................................................................................7 <br /> 3.0 PROPOSED ACTIVITIES.................................................................................................7 <br /> 3.1 PERMITTING....................................................................................................................7 <br /> 3.2 SITE PREPARATION.........................................................................................................7 <br /> 3.3 AASF WASH RACK GROUNDWATER AND SOIL GAS INVESTIGATION ..................................8 <br /> 3.3.1 Grab Groundwater Sampling.................................................................................8 <br /> 3.3.2 Soil Gas Survey.....................................................................................................9 <br /> 3.3.2.1 Soil Gas Probe Depth.........................................................................................9 <br /> 3.3.2.2 Soil Gas Probe Emplacement............................................................................9 <br /> 3.3.2.3 Equilibrium Time...............................................................................................10 <br /> 3.3.2.4 Purge Volume Test...........................................................................................10 <br /> 3.3.2.5 Shut-in Testing .................................................................................................10 <br /> 3.3.2.6 Leak Testing.....................................................................................................10 <br /> 3.3.2.7 Purge/Sample Flow Rate..................................................................................10 <br /> 3.3.2.8 Filed QC Samples ............................................................................................11 <br /> 3.3.2.9 Field Condition Considerations.........................................................................11 <br /> 3.3.2.10 Decontamination and Borehole Abandonment.................................................11 <br /> 3.4 GROUNDWATER MONITORING WELL INSTALLATION.........................................................12 <br /> 3.5 SOIL SAMPLING DURING WELL INSTALLATION ................................................................12 <br /> 3.6 WELL DEVELOPMENT....................................................................................................13 <br /> 3.7 GROUNDWATER MONITORING WELL SAMPLING..............................................................13 <br /> 3.8 GROUNDWATER MONITORING WELL AND DIRECT-PUSH BORING SURVEYING..................14 <br /> 3.9 INVESTIGATION-DERIVED WASTE(IDW).........................................................................14 <br /> 4.0 REPORTING...................................................................................................................15 <br /> 4.1 COMBINED SITE INVESTIGATION REPORT.......................................................................15 <br /> 4.2 QUARTERLY GROUNDWATER MONITORING REPORTS.....................................................15 <br /> 4.3 FOURTH QUARTERLY GROUNDWATER MONITORING REPORT.........................................15 <br /> 5.0 PROJECT SCHEDULE ..................................................................................................16 <br /> 6.0 QUALITY CONTROL PLAN (QCP)................................................................................16 <br /> 6.1 NATURE AND PURPOSE OF PLAN ...................................................................................16 <br /> 6.2 PROJECT ORGANIZATION ..............................................................................................16 <br /> 6.2.1 Corporate Project QC Manager...........................................................................17 <br /> 6.2.2 Project QC Manager............................................................................................17 <br /> OTI E I <br />
The URL can be used to link to this page
Your browser does not support the video tag.