My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
STIMSON
>
2000
>
2900 - Site Mitigation Program
>
PR0009229
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/27/2020 8:05:45 AM
Creation date
6/26/2020 5:02:08 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0009229
PE
2960
FACILITY_ID
FA0004047
FACILITY_NAME
STOCKTON ARMY AIR SUPPORT FAC
STREET_NUMBER
2000
STREET_NAME
STIMSON
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
17726004
CURRENT_STATUS
01
SITE_LOCATION
2000 STIMSON ST
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
166
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Work Plan for the <br /> Former Two 20,000-Gallon USTs Location at Stockton AASF <br /> California Army National Guard <br /> • Notify Underground Service Alert(USA)a minimum of 48 hours prior to commencement of <br /> field activities. The USA phone number is 1-800-227-2600. <br /> • Coordinate inspection of decommissioning activities with the San Joaquin County PHS-EHD. <br /> • Calculate the approximate volume of grout needed to fill each borehole from the bottom of each <br /> well to the ground surface,and mix 10.3 sack slurry mixture(188 pounds sand per 94-pound sack <br /> cement[2 parts sand to 1 part cement by weight] and 7 gallons of water)after the boreholes are <br /> drilled. <br /> • Place tremie pipe at the bottom of the over-drilled borehole and pump the slurry into the borehole <br /> through the tremie pipe,bringing the grout slurry to ground surface for each former well. <br /> • Record the volume of slurry placed in each well. <br /> 6.15 Gregg Drilling,Inc.,has been selected as the subcontractor for this field effort. The contact at <br /> Gregg Drilling for this effort is Chris Pruner(telephone number 925-313-5800). <br /> 6.16 This decommissioning effort will be scheduled upon completion of the above-described <br /> investigation events if warranted,and approved by RWQCB. <br /> 6.17 Resuming Quarterly Sampling.The three existing MWs(MW-1 through MW-3)may be <br /> redeveloped if it is determined that groundwater beneath the site has been inadequately characterized <br /> and site closure cannot be granted until further site characterization is completed. If groundwater <br /> sampling indicates that impacts are present,then the items described in the following subsections <br /> may be required,to continue the process for site closure. <br /> 6.18 This section of the WP summarizes the activities necessary to redevelop and sample the three <br /> existing MWs that were installed 15 years ago.All field activities will be conducted in accordance <br /> with San Joaquin County regulations and coordinated with the San Joaquin PHD-EHD. <br /> 6.19 Redevelopment.The redevelopment procedure will be swabbing and bailing followed by <br /> pumping.At a minimum,the following procedures will be performed: <br /> • A bailer or similar device will be used to remove sand or fine material from the bottom of the <br /> well—the well will be bailed until less than approximately 1 teaspoon of sand or fine material is <br /> collected in the bailer. <br /> • The well will then be swabbed with a valved surge block appropriately sized for the inside <br /> diameter of the well.The swabbing will begin just below the static water line in the casing,with <br /> a gentle action,until free movement of water through the screen is assured,at which time surging <br /> can progress more actively. <br /> • The surge block will then be lowered gradually into the screened area(s). The amount of material <br /> drawn into the well will be frequently measured and will be removed by frequent bailing with a <br /> sand bailer. <br /> • Repeat steps one through three at least three times or until less than 1 teaspoon of sand of fine <br /> material is collected in the bailer. <br /> KAWprocess\0025 MA ARNG\Stockton AASF WP\FINAL\WP text.doc 10 June 2007 <br />
The URL can be used to link to this page
Your browser does not support the video tag.