My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
I
>
INDUSTRIAL
>
1010
>
2200 - Hazardous Waste Program
>
PR0518741
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2020 4:25:17 PM
Creation date
6/30/2020 1:01:27 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0518741
PE
2220
FACILITY_ID
FA0010456
FACILITY_NAME
THATCHER COMPANY OF CALIFORNIA INC
STREET_NUMBER
1010
STREET_NAME
INDUSTRIAL
STREET_TYPE
DR
City
STOCKTON
Zip
95206
APN
17728053
CURRENT_STATUS
01
SITE_LOCATION
1010 INDUSTRIAL DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
346
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sierra Chemical Co. <br /> RCRA Contingency Plan <br /> 2.6 Hazmat Emergency Response Team (ERT) <br /> An organized group of employees,designated by Sierra Chemical Co.,who are expected to perform work <br /> to handle and control actual or potential leaks or spills of hazardous substances requiring a possible close <br /> approach to the substance. The HAZMAT/ER Team performs responses to releases or potential releases <br /> of hazardous substances for the purpose of control or stabilization of the incident.A complete list of these <br /> individuals is provided in Appendix C.All certificates of training and training logs will be kept onsite by the <br /> EHSS Manager. <br /> 2.7 Emergency Response Dispatcher <br /> In the event of-a major spill/release, Sierra Chemical Co. has designated several individuals within the <br /> office staff to be responsible for notifying everyone carrying radios. The ER Dispatcher would use the <br /> Internal paging system to alert the employees,including the Emergency Response Team,of the nature of <br /> the emergency, The Dispatcher would also notify appropriate response agencies and neighboring <br /> businesses, if necessary. These individuals will be provided a complete listing of.which government <br /> agencies to notify based on nature or severity of the spill/release. . <br /> The designee in order of availability is as follows: <br /> 1, Administrative Assistant t" <br /> 2. EHSS Manager <br /> 3, Transportation Dispatcher/Loading and Shipping Supervisor <br /> 4. Transportation Supervisor <br /> 5. Production Supervisor <br /> If none of these individuals are on duty,and the alarm has sounded,the response agencies will be notified I <br /> by the contract security control company(Sonitorol).Sierra Chemical Co:s IC would make the notification <br /> to the neighboring businesses. <br /> 2.8 Staging Manager <br /> The Staging Manager will pick up a copy ofthe Emergency Response Plan that will be located in the office. <br /> He/She or their designee at the evacuation staging area shall immediately conduct a head count to verify <br /> all personnel other than the ERT,are accounted for. The Staging Manager shall assign individuals to assist <br /> with site security until relieved by the Stockton Fire Department Hazardous Materials Team, followed by _ <br /> the Stockton Police. This person shall have two-way communications with the IC. This person,may also <br /> act as the Emergency Response Dispatcher in a combined role. <br /> I It`i)2(C'Y9"eentation <br /> The provisions of the contingency plan will be implemented whenever there is an emergency event that <br /> could threaten human health or the environment, or whenever the potential for such an event exists <br /> determined by the IC.The following information is utilized for categorization of events to determine <br /> implementation of the Contingency Pian: <br /> 1. Medical Emergencies(does not implement the Contingency Plan) <br /> 2. No (does not implement Contingency Plan) <br /> a. Fire already out and did not involve hazardous materials <br /> Prepared By: _ Issue date: Replaces: Pa e: <br /> ACT Environmental Services, Inc. Februa 25;2016 g <br /> NA 11 of 44 <br />
The URL can be used to link to this page
Your browser does not support the video tag.