Laserfiche WebLink
i <br /> �I <br /> 15 March 2005 <br /> AGE-NC Project No. 04-1168 <br /> Page 5 of 9 <br /> 3.3. MONITORING WELL COMPLETION <br /> Pilot borings MW-1 through MW-3 will be completed as 2-inch diameter ground water monitoring <br /> wells. Procedures for well completion are detailed in Section 4.2.. <br /> 3.4. WELL DEVELOPMENT AND SURVEY <br /> Following well installation,each well will be developed to maximize water flow and minimize the <br /> amount of fine-grained sediment drawn into the well during pumping or bailing.After development, <br /> the top of each well casing(well head)will be surveyed to determine its exact location and elevation <br /> relative to mean sea level.Procedures for well development and survey are presented in Section 4.3.. <br /> 3.5. GROUND WATER MONITORING AND ANALYSIS <br /> Ground water monitoring of each newly installed ground water monitoring well will be conducted <br /> on a quarterly basis unless an alternate schedule or suspension of monitoring is approved by the <br /> SJCEHD. Ground water monitoring activities will include recording depth to ground water <br /> measurements and collection of ground water samples. Ground water sample collection procedures <br /> are described in Section 4.4.. Ground water samples will be analyzed by a State of California DHS- <br /> certified laboratory for the constituents listed in Section 3.2.. <br /> 3.6. REPORT PREPARATION <br /> Following the completion of soil borings, well installation and initial monitoring of the newly <br /> installed wells,a report will be prepared presenting the findings.The.report will include a description <br /> of work performed and the results of soil and ground water sampling and analysis.Laboratory reports <br /> for ground water analyses,testing methods,laboratory QA/QC reports,and sample chain of custody <br /> documentation will be presented in quarterly reports. Conclusions and recommendations will also <br /> be included in the reports, if applicable. The reports will be in a format acceptable to the <br /> CVRWQCB, and will be reviewed and signed by a California Professional Geologist. <br /> 4.0. FIELD PROCEDURES <br /> All field procedures will be overseen by an AGE representative under the supervision of a California <br /> Professional Geologist. Procedures for the advancement of the soil boring, monitoring well pilot <br /> borings, soil sampling, ground water sampling, monitoring well completion, equipment <br /> Advanced GeoEnvironmcntal,Inc. <br />