My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
3012
>
2900 - Site Mitigation Program
>
PR0522786
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2020 3:12:23 PM
Creation date
6/30/2020 1:56:22 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0522786
PE
2950
FACILITY_ID
FA0015536
FACILITY_NAME
ARROYOS SMOG SHOP
STREET_NUMBER
3012
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
STOCKTON
Zip
95205
APN
14313024
CURRENT_STATUS
01
SITE_LOCATION
3012 E WATERLOO RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
15 March 2005 <br /> AGE-NC Project No. 04-1168 <br /> Page 7 of 9 <br /> The remaining annular space above the bentonite seal will be filled to within one foot of the ground <br /> surface with a cement grout. The grout mixture will consist of Type I/II portland neat cement and <br /> not more than 6 gallons of water per 94-pound sack of cement.The grout will be placed by pumping <br /> through a tremie pipe. The SJCEHD will be notified for grout inspection at least 48 hours prior to <br /> conducting grout procedures.A traffic-rated well box will then be installed over the well casing.The <br /> monitoring well construction details are illustrated in Figure 3. <br /> 4.3. WELL DEVELOPMENT AND SURVEY <br /> Development will consist of a combination of bailing to remove the major portion of fine-grained <br /> sediment from inside the well, surging to flush out or draw in sediment from the filter pack, and <br /> additional bailing to finish the removal of sediment.Development activities will be continued until <br /> field parameter readings(pH,electrical conductivity,and temperature)have stabilized.Additionally, <br /> each well head location and elevation will be surveyed by a licensed surveyor. <br /> 4.4. GROUND WATER SAMPLING PROCEDURES <br /> Ground water sample collection will be performed in accordance with the SJCEHD's Recommended <br /> Groundwater Sampling Guidelines, dated 15 February1995. <br /> 4.4.1. Static Water Level Measurements <br /> Before purging and sampling during ground water monitoring events, static water level will be <br /> measured using an electric water level indicator. Water level data will be recorded to the nearest <br /> 0.01-foot from a reference point marked at the top of the PVC.well casing.Before and after each use, <br /> the water level indicator will be washed in an Alconox solution and rinsed with water. <br /> 4.4.2. Well Evacuation <br /> Subsequent to measurement of depth to water and-prior to sampling,the well will be purged using <br /> an inertia pump or a disposable bailer to ensure that the sample is representative of the formation, <br /> rather than water standing in the well casing. The well will be purged until: 1) a minimum of three <br /> casing-water volumes has been removed from the well; and/or 2)the field-measured ground water <br /> parameters,pH,temperature and conductivity have stabilized.However,if a well is purged dry prior <br /> to evacuating three casing volumes, a ground water sample will be collected following 80 percent <br /> recovery of ground water level or after a minimum of 1 hour but within 8 hours of well evacuation. <br /> Advanced GeoEnvironmental,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.