My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BECKMAN
>
1255
>
2200 - Hazardous Waste Program
>
PR0518755
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2020 3:04:42 PM
Creation date
6/30/2020 1:58:06 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0518755
PE
2227
FACILITY_ID
FA0013539
FACILITY_NAME
Lodi Chrysler Dodge Jeep Ram
STREET_NUMBER
1255
Direction
S
STREET_NAME
BECKMAN
STREET_TYPE
Rd
City
Lodi
Zip
95240
CURRENT_STATUS
01
SITE_LOCATION
1255 S Beckman Rd
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECEIVE <br /> FEB 1 1 2� <br /> Spill Prevention Compomance Cor NjHEALTH <br /> ES <br /> P.O . Box 1259 . . ... .. . . . Waterford' CA 9.53.86 Telephone ; (2U9) .9ij -0851 <br /> Ehiail : spec:orpn trinail . c om <br /> Website : www, spcplan.com <br /> Certified Assessment Form WE-) for AST Systems <br /> Assessor : 'Spill Prevention Compliance Corporation Onsite .Assessor; Todd: +Mo. h rter <br /> P.O. Box 12$9 Telephone& (2091969 085_1 <br /> Wateirford., CA 95386 email: sip ceorp(a),hotmail oft <br /> Client: Lodi 'Chr , sler-Doda4e� en-Ram Contact Weston Boedine. Parts & Svc. Director <br /> Address: US$ So. Heckman Rd. Phone No. : 209-263-3999 <br /> City/State/Zip ;_ Lodi, CA:, 95240 . Date of Test: 06 ,1019 <br /> Assessment Data= Waste Oil AST =a <br /> 1 . AST Configuration & age of AST horizontal AST Double wall steel/approx 15vrs old( estimate )„ <br /> 1 a. Useful Life Remaining of AST AST has . a»»roximately 25 years of remaining life (Subsection V4+10) <br /> 2 . AST Primary vessel construction (describe.) . 1000 Gals/Waste- 0Jl/ # IISylatenot. accessible /UL142 <br /> Containerl Made to UL 142 construction standard=at least J23 in steeltl ickness per VL Std for Safety for <br /> Steel Aboveground Tanks for Flammable and Combustible Liquids, suitable for containing waste oil: <br /> 3 . AST piping (describe) lin, . in. etevafed copper pipe from Grano Hdslty 1050 onegmatic pump.to I In <br /> hydraulic hose to 2 in oueninu w/fitting, from 0.0mu for supply to top of AST There is an inline check valve <br /> between quick connect pick ,00. hose & num ». Pining is adequately secured, supported & Arotected against <br /> physical damage .and excessive stress clue to settlement vibration expansion or contraction, & was tested <br /> found to. be: in good condition & not. leaking: Pining has manual ball valve shut downs, <br /> 4. Internal/External puiip description_ external wall mounted Graco Husky 1050 pneumatic pump w/2 solenoid <br /> 12volt40-200psi-w/continuous electronic monitoring, WE 007 _Alarms, & IBM OOT SV solenoid pneumatic <br /> auto shut down-Externalbnm» which mumps from waste oil caddies from service area Ancillary Ugiyment <br /> is 'secured to Wall, & supported and protected against physical damage and excessive stress 'duet settlement, <br /> vibration, 21gansion or contraction (see P10 <br /> 5 . AST drawing (provided/drawn: source) (see attached) <br /> 6. Design Standard (ASME, UL, etc.) UL .142+ -Double Wall Steel Mr.. Containment Solutions <br /> 7 . AST foundation (describe) _ concrete sub4loor; Base of AST under UL 142 adequate to withstand the load <br /> of a hill tank-Tank is anchored to floor: . <br /> 8. AST anchoring (seismic zone/floatation risk) AST is anchored, with . steel flanges which are . braced against <br /> outer shell ofHoly tank.. base & % in, anchor bolts -into the concrete floor Lodi is a (kroundshaking/ <br /> 1 . <br /> liquefaction) seismic region. AST U situated in secured locked lubrieants ` roonn at Westside rear of Service <br /> area. . The tanks are unlikely to move outside the enclosure in a seismic event or a floodin eg venit <br /> 4 <br /> 9: AST will withstand frost-heave XX Yes No. AST is located in secured lubricants rooni at rear of <br /> Service- Area building not- subject to weather conditions <br /> 10 AST previously relocated? Yes XX No € <br /> 11 . AST Corrosion. i'rotection Tank is . covered in paint, with no evidence of external. corrosion. . Tank has <br /> no specific. corrosion protection beyond the pabit. No hart o€ the AST touches the ground The base of the <br /> AST is steel, raised 3 inches from the concrete mad There is no evidence of internal corrosion taking place <br /> Tank' s'. construction material is. .carbon steel, <br />
The URL can be used to link to this page
Your browser does not support the video tag.