Laserfiche WebLink
pration <br /> P. O. Box 1289 . . . . . . . Materford, CA 95386 Telephone : (209) 969-0851 <br /> Email : spCe=0a hotmail.. com. <br /> Website : www. spcplan. coM <br /> Certified Assessment Form (PE) for AST Systems <br /> Assessor: ;Spill Prevention Compliance Corporation Onsite Assessor:Todd McWhorter <br /> P. O . Box 1259 Telephone; (209) 969-0851 <br /> Waterford, CA 95386 emait : spccorp@hotinail.com <br /> Client: Lodi Chrysler-Dodge4eepwRam ,Contact Weston Boeding, Parts & Svc. Director <br /> Address : 1255 So. Beckman Rd. Phone No. , 209-263-3999 <br /> C147/State/Zip ; . Lodi, CA 95240 Date of Test: 1 -30-2019 <br /> Assessment Data- Waste Coolant AST Poly -a <br /> 1 . AST Configuration & age (describe) 'Vertical Double-wall Poly 1809000/9014/130 gals/ 10 yrs old ( estimate J <br /> Ia. Useful Life Remaining of AST AST has approximately 30 years of remaining life Qbsection k] 410)-No <br /> UV e4�20suf e <br /> 2 . AST Primary vessel construction (describe) Double-wall Poly IS09000/9014 in compliance with 40CFR <br /> 264. 193 — Vertical Poly AST /Mfr: Peabody <br /> 3 . AST piping (describe) l in. single wall copper pipe from Graco Husky 1050 pneumatic Dump to 1 in <br /> hyAraulic hose to 2 in open m w/fiffinii . frown Pump for supply to top of AST. Piping is Ade uatel , secured <br /> sutworted & orotected against 0hvsicat damage and excessive stress due to settlement vibration expansion or <br /> contraction, &was tested found to be in good condition & not leaking <br /> 4 . Internal/External pump description external wall mounted Graco Husky 1050 pump iv/2 solenoid 12volt 10 <br /> 200psi- �v/ continuous electronic monitoring BJ Enterprises 007 hi level visual audible alarms & manual <br /> ball-valve shut downs at tank and " um ' s- S stem also. has BJE 007SVPneumatic solenoid auto shut downs for <br /> high levels and also for leak detection External pumps, which numps waste coolant from waste coolant <br /> caddies from service areas to AST. Ancilla a ui ment is secured to wall & su orted and rotected a ainst <br /> Physical damage and excessive stress due to settlement, vibration , expansion or contraction (seeyic) <br /> 5 . AST drawing (provided/drawii : source) (see attached) <br /> 6 . Design Standard (ASME, UL, etc .) Poly IS09000/9014 compliance with 40CFR-264 193 Integral secondary <br /> containment tank system des n. Mfr: Peabod <br /> 7 . AST foundation (describe) concrete sub-floor. Base of AST under UL 142 adequate to withstand the load <br /> of a full tank-Tank is anchored . <br /> 8 . AST anchoring : (seisinic zone/floatation risk) AST is anchored , with steel flanges which are braced against <br /> outer shell of oI tank' base &I ll: in anchor bolts into the concrete floor, Lodi is a (gwoundshaking/ <br /> liquefaction) seismic realmAST is situated in secured locked lubricants room at West side rear of Service <br /> area. The tanks are unlikely to move outside the enclosure in a seismic event or a flooding event <br /> 9 . AST will withstand frost"heave _ XLX'Yes No AST_ is located in secured Inbricauts room at rear of <br /> Service Area building not subiect to weather conditions <br /> l0 . AST previously relocated ? Yes XX No <br /> 11 . AST Corrosion Protection _ AST is located in secured covered lubricants room away from weather. PON <br /> I <br />