My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
2829
>
2900 - Site Mitigation Program
>
PR0523460
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2020 2:58:39 PM
Creation date
6/30/2020 2:07:27 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0523460
PE
2960
FACILITY_ID
FA0015854
FACILITY_NAME
LESCO INC
STREET_NUMBER
2829
Direction
W
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14502013
CURRENT_STATUS
01
SITE_LOCATION
2829 W WASHINGTON ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms.Amy Terrell <br /> 18 March 2011 ERM-West,Inc. <br /> Page 5 <br /> REPORTING AND SCHEDULE <br /> The data results of the proposed soil and groundwater investigation will <br /> be summarized in a letter report and submitted to the Regional Water <br /> Quality Control Board (RWQCB) as notification that the investigation <br /> work is complete. <br /> Concurrently, the data obtained during the proposed investigation will <br /> be combined with previously collected data and presented in a <br /> Corrective Action Workplan(CAW) that will be submitted to the <br /> RWQCB for review. The CAW will present the proposed remedial <br /> actions for the site to achieve a No Further Action status. <br /> The planned schedule of activities is as follows: <br /> Task Duration <br /> Fieldwork(including soil boring . Permitting — 2 weeks <br /> advancement,soil sample collection and , Utility clearances — 1 week <br /> monitoring well groundwater sample <br /> collection). • Fieldwork — 1 week <br /> Laboratory analysis of samples. . 2 to 3 weeks <br /> Data evaluation and generation of . 2 weeks <br /> figures and tables. <br /> Preparation of letter report presenting . 2 to 3 weeks <br /> analytical results. <br /> Preparation of Corrective Action . 4 to 6 weeks <br /> Workplan detailing proposed site <br /> remedial actions. <br /> If you have any questions or comments regarding the activities proposed <br /> in the Workplan,please contact the undersigned at(916) 924-9378. <br /> Sincerely, <br /> Matthew A. Scheeline Bruce A. Lewis, P.G.4783 <br /> Project Manager Program Director <br /> MAS/BAL/0129740.01 <br /> enclosures <br /> cc: Mr. Robert Brod, Deere <br />
The URL can be used to link to this page
Your browser does not support the video tag.