My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
2417
>
2900 - Site Mitigation Program
>
PR0523601
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2020 3:02:48 PM
Creation date
6/30/2020 2:13:19 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0523601
PE
2950
FACILITY_ID
FA0015930
FACILITY_NAME
R & L DIESEL SERVICE INC
STREET_NUMBER
2417
STREET_NAME
WEST
STREET_TYPE
LN
City
STOCKTON
Zip
95205
APN
11709007
CURRENT_STATUS
01
SITE_LOCATION
2417 WEST LN
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
193
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WORK PLAN ADDENDUM <br /> Secure a Soil Sample From Under a Waste Oil UST <br /> Closed in Place in April 1988, and <br /> Check for the Presence of Two Additional USTs On-Site <br /> 1.0 Introduction <br /> This addendum to the Work Plan issued on January 28, 2005, responds to comments <br /> received from The Environmental Health Department, San Joaquin County (EHD), on <br /> February 15, 2005, (copy included in Appendix A). EHD requires that soil samples be <br /> secured both above and below the closed in place Waste Oil UST, and that the sample <br /> from below the tank be secured using a van mounted probe boring machine capable of <br /> slant boring, rather than the hand auger proposed. Samples to be analyzed for TPHg and <br /> TPHd by EPA 8260, BTEX by EPA 8260, chlorinated hydrocarbons by EPA 8010, 8240 <br /> or 8260, MTBE, TBA, EtBE, TAME by EPA 8260, metals by ICAP 6010 or AA 7000, <br /> PCB by EPA 8270 or 8080. <br /> I <br /> Should USTs be found in front of the Parts Building, they will be removed under permit <br /> and inspection by the EHD tank compliance unit. Soil samples will be taken from under <br /> the tanks and analyzed for TPHg, TPHd, BTEX, MTBE, DIPE, EtBE, TAME and total <br /> Lead, using appropriate EPA methods. <br /> The balance of the Introduction is unchanged from the Work Plan. <br /> 2.0 Site Description <br /> This is unchanged from the Work Plan. <br /> 3.0 Purpose of Investigation <br /> The purpose of the investigation is unchanged from the Work Plan, except that, should <br /> USTs be found in front of the Parts Building, they will be removed as outlined in the <br /> EHD letter of February 15, 2005. <br /> 4.0 Discussion <br /> This section is essentially unchanged, except that, should USTs be found in front of the <br /> Parts Building, they shall be removed as outlined in the EHD letter of February 15, 2005. <br /> 5.0 Procedure <br /> The Waste Oil UST is a 600 gallon tank, installed vertically (see Appendix A - letter <br /> dated 1/14/87 from J. Rokoszewski, President of R& L, and invoice no. 1438 from Delta <br /> i <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.