My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WOODBRIDGE
>
5950
>
2900 - Site Mitigation Program
>
PR0523822
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2020 2:50:36 PM
Creation date
6/30/2020 2:18:53 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0523822
PE
2965
FACILITY_ID
FA0016043
FACILITY_NAME
WOODBRIDGE WINERY/ ROBERT MONDAVI
STREET_NUMBER
5950
Direction
E
STREET_NAME
WOODBRIDGE
STREET_TYPE
RD
City
ACAMPO
Zip
95258
APN
01709058
CURRENT_STATUS
01
SITE_LOCATION
5950 E WOODBRIDGE RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KC nnetiyJenits Consultants <br /> Appendix E: Standard Operating Guideline <br /> Boring and Subsurface Soil Sampling <br /> 91 <br /> i � <br /> Introduction <br /> This guideline describes the equipment and procedures that are used by Kennedy/Jenks <br /> Consultants personnel for drilling and collecting soil samples. <br /> .f <br /> Equipment I <br /> • Drill rigs and associated drilling and sampling equipment as specified in work plan: <br /> • Hollow stem auger <br /> • CME, 5 ft x 94 mm continuous-core barrels (hollow-stem auger) <br /> • 2.5-inch or 2.0-inch I.D. split-spoon drive sampler <br /> • 2.5-inch or 2.0-inch brass liners and sealing materials (plastic end caps, Teflon seals, silicon <br /> tape, zip-lock plastic bags) <br /> • Large capacity stainless steel borehole bailer <br /> • Sampler cleaning equipment <br /> • Steamcleaner <br /> • Generator <br /> • Stiff-bristle brushes <br /> • Buckets <br /> • High purity phosphate-free liquid soap, such as Liquinox <br /> • Potable water <br /> • Insulated sample storage and shipping containers <br /> • Personal protective equipment(refer to project site safety plan) <br /> Typical Procedure <br /> 1. Obtain applicable drilling and well construction permits prior to mobilization. <br /> 2. Clear drilling locations for underground utilities and structures by Underground Service Alert <br /> (USA) and subcontractors. <br /> 3. Have all downhole equipment steamcleaned prior to drilling each boring. <br /> 4. Make sure that borings not completed as monitoring wells are grouted to the surface, using a <br /> neat cement-bentonite grout (containing approximately 5 percent bentonite). <br /> 5. Collect soil samples for litholo is logging purposes with a CME continuous coring system in <br /> 5-foot increments. <br /> 6. Collect soil samples for lithologic logging and chemical and physical analyses by driving a split- <br /> spoon drive sampler, in 2.5-to 5-foot increments, below the depth of the auger bit with a <br /> Crop Uptake and Assimilative Capacity Work Plan, 1 <br /> Woodbridge Winery, Acampo, California <br /> pWgWWn*"a 031030123.05xvodbr*kel0 po kr upW =u 7cepe pNlAWp es*pe.dw <br />
The URL can be used to link to this page
Your browser does not support the video tag.