My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FRONTAGE
>
1022
>
2200 - Hazardous Waste Program
>
PR0519099
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2020 3:34:55 PM
Creation date
6/30/2020 3:21:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0519099
PE
2229
FACILITY_ID
FA0014293
FACILITY_NAME
GILL EXPRESS INC
STREET_NUMBER
1022
Direction
E
STREET_NAME
FRONTAGE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
26102004
CURRENT_STATUS
01
SITE_LOCATION
1022 E FRONTAGE RD
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONTAINMENT SAFEWASTETM <br /> S o L U T 1 o N S® TANK SPECIFICATIONS <br /> 1 . GENERAL TANK DESCRIPTION: <br /> 1 . 1 . The SafeWaste Aboveground Used Oil Collection and Storage Systems are constructed in accordance with National, State, and Locally <br /> recognized Aboveground StorageTank Standards, such as: Underwriters Laboratory Standard 142 for the primary tank, National Fire <br /> Protection Association Sections 30 & 30A, and Uniform Fire Code, <br /> 1 .2. The SafeWaste Systems provide a minimum of 110% secondary containment for the primary tank, and 3600 radius containment for the <br /> primary tank and control assemblies. <br /> 1 .3. The control assemblies shall be new, and installed on top of the primary tank at the factory. <br /> 1 .4. The anchoring tie downs shall be an integral part of the exterior support feet and shall be welded to the bottom of the Environmental Tank <br /> Enclosure, <br /> 1 .5. The SafeWaste Systems must be off-loaded on site with a large forklift or crane. <br /> 1 .6. All openings in the primary tank shall be from the top, with threaded NPT fittings. <br /> 1 .7. The SafeWaste Systems shall include a one ( 1 ) year warranty for the tanks and accessories. <br /> 1 .8. The SafeWaste manufacturer shall provide proof of a minimum 10 years of manufacturing SafeWaste Systems. <br /> 2. PRIMARY STORAGE TANK: <br /> 2.1 . The primary storage tank shall be rectangular in design and constructed of UL specified steel thickness, with continuous welds. <br /> 2.2. The primary storage tank shall be constructed and listed in accordance with UL 142 standards. <br /> 2.3. The primarytank shall be fitted with a minimum of: a 3/4" product inlet, a 2" overfill prevention valve, a 2" suction tube for product <br /> withdrawal, a 2" primary working vent, either a 4" or 6" emergency vent, a 2" product level gauge, and a 11' sampling port. <br /> 2.4. The primary tank shall be pressure tested to UL 142 Standard (minimum 3 to maximum 5 psi) at the factory. <br /> 2.5. The primary tank shall be mounted within the secondary containment cabinet by means of at least four (4) stabilizing brackets to prevent the <br /> primary tank from shifting. <br /> 2.6. The primary tank shall be placed within the secondary containment cabinet with a minimum of 3" visual clearance around all sides to allow <br /> for 100% visual inspection . <br /> 2.7. The exterior of the primary tank shall be cleansed of foreign material, and coated with a corrosion resistant industrial paint (3 to 5 mils dry <br /> film thickness). <br /> 3. ENVIRONMENTAL TANK ENCLOSURE: <br /> 3.1 . The Environmental Enclosure (secondary leak containment tank) shall be rectangular in design and constructed with a minimum 12 ga. steel. <br /> All welds shall be full penetration . <br /> 3.2. The Environmental Enclosure shall be separate from the primary tank, and shall not be welded or attached to the primary tank in any fashion . <br /> 3.3. The secondary leak containment tank shall completely enclose the primary tank and all operating equipment (3600 radius), providing <br /> secondary containment to the primary tank and operating equipment, It shall be sized to contain 110% of the primary tank storage capacity. <br /> 3.4. The inside bottom of the secondary tank shall be fitted with a minimum of two (2) raised steel channels (a minimum of 2" in height), to <br /> support the primary tank above the secondary tank floor. <br /> 3.5. The secondary tank shall be supported by two (2) 4" high steel support feet channels with integral anchoring holes to maintain ground <br /> clearance for better anchoring to concrete fo •andation . <br /> 3.6. The secondary tank shall contain a removable, locking roof that provides at least 30" of clearance from the top of the primary tank to the <br /> bottom of the roof. <br /> 3.7. The secondary containment cabinet shall contain louvered vents on the cabinet, which is above the level of the primary tank. These vents <br /> shall provide a minimum of 20" of venting capacity. <br /> 3.8. The secondary containment cabinet shall contain a knock-out hole above the primary tank level to provide for the working vent installation. <br /> Internally threaded couplers for air supply hose (1 /2") and product suction (3/4") shall be welded into the side of the cabinet above the top <br /> of the primary tank, so that the respective hoses are easily installed, and contractors do not have to create any hole in the side of the cabinet. <br /> The cabinet shall not be drilled or penetrated, or in any way destroy the integrity of its containment capacity. <br /> 3.9. The secondary containment cabinet shall include a hinged, locking security door with viewport for the product level gauge and OPTIONAL <br /> annular space leak detection gauge, and shall be mounted on a removable door frame, at or above the level of the primary tank. This will <br /> provide access to the components for service or extraction operations. The removable door frame shall allow for easy replacement of the <br /> door and frame if they are damaged during operating procedures. <br /> 3.10. The interior surface of the secondary containment cabinet shall be cleansed of foreign material, and coated with a corrosion resistant <br /> industrial paint (3 to 5 mils dry film thickness). The exterior surface of the secondary containment cabinet shall be cleansed of foreign <br /> material, and coated with a corrosion resistant industrial paint (3 to 5 mils dry film thickness). <br /> 3.11 . The primary tank shall be stabilized from lateral movement within the enclosure by placement of four (4) lateral supports, one at each corner <br /> of the primary tank, welded to the base plate of the enclosure. <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.