My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FRONTAGE
>
1022
>
2200 - Hazardous Waste Program
>
PR0519099
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2020 3:34:55 PM
Creation date
6/30/2020 3:21:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0519099
PE
2229
FACILITY_ID
FA0014293
FACILITY_NAME
GILL EXPRESS INC
STREET_NUMBER
1022
Direction
E
STREET_NAME
FRONTAGE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
26102004
CURRENT_STATUS
01
SITE_LOCATION
1022 E FRONTAGE RD
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE 1 (Continued ) <br /> EXISTING ABOVEGROUND STORAGE TANKS SYSTEM INTEGRITY EVALUATION <br /> Regulatory Citation <br /> Number" <br /> 22 CCR § 66265. 191 Regulatory Citation Language Facility Compliance <br /> For tank systems that transfer, store or treat The AST and ancillary equipment have been designed to <br /> materials that become hazardous wastes this safely contain the used oil present in the system <br /> (c) assessment shall be conducted within 12 components . . <br /> months after the date that the waste becomes A licensed hazardous waste contractor is retained by the <br /> a hazardous waste , except as provided in Facility to remove the used oil from the AST and to <br /> subsection (g) of this section , dispose of the used oil properly. . <br /> If, as a result of the assessment conducted in <br /> accordance with subsection (a) or (e) of this <br /> (d) section , a tank system is found to be leaking or The AST and ancillary equipment were observed to be <br /> unfit for use, the owner or operator shall free of leaks and are fit for continued use. <br /> comply with the requirements of section <br /> 66265 . 196 . <br /> The tank system assessment shall include all <br /> of the following information : <br /> ( 1 ) Tank configuration (i . e . horizontal , The AST configuration , material of construction , piping <br /> vertical) , and gross capacity (in <br /> gallons) ; material and diameters , are contained in the formal <br /> inspection report. <br /> (2) Design standard (s) if available , <br /> according to which the tank and Visual observations coupled with AST inspection <br /> • <br /> (g ) ancillary equipment were constructed techniques specified in the Steel Tank Institute, <br /> and all of the following information ; Standard for the Inspection of Aboveground Storage <br /> Tanks, SP001, 6 Edition, Issue Janueary 2018 were <br /> (A) Material of construction ; utilized to evaluate the integrity of the AST and the <br /> ( B) Material thickness and the method secondary containment structure. <br /> used to determine the thickness ; <br /> (C) Description of tank system piping <br /> material , diameter <br />
The URL can be used to link to this page
Your browser does not support the video tag.