Laserfiche WebLink
CERS Consolidated Emergency Response/Contingency Plan—Page 4 of 4 Rev.06/27/11 <br /> H.EARTHQUAKE VULNERABILITY <br /> Identify areas of the facility that are vulnerable to hazardous materials releases/spills due to earthquake-related motion.These areas require immediate isolation <br /> and inspection. <br /> VULNERABLE AREAS:(Check all that apply) Hl. LOCATIONS(e.g.,shop,outdoor shed,forensic lab) <br /> ® 1.HAZARDOUS MATERIALS/WASTE STORAGE AREA Maintenance Shop H2. <br /> ❑2.PROCESS LINES/PIPING Dismantling Area H3. <br /> ❑3.LABORATORY Quality Control Building H4. <br /> ❑4.WASTE TREATMENT AREA H,, <br /> Identify mechanical systems vulnerable to releases/spills due to earthquake-related motion.These systems require immediate isolation and inspection. <br /> VULNERABLE SYSTEMS:(Check all that apply) H6. LOCATIONS <br /> ® 1.SHELVES,CABINETS AND RACKS Dismantling Area H7. <br /> ®2.TANKS(EMERGENCY SHUTOFF) Maintenance Shop Hs. <br /> ®3.PORTABLE GAS CYLINDERS Warehouse H9. <br /> ®4.EMERGENCY SHUTOFF AND/OR UTILITY VALVES Quality Control Building HIo. <br /> ®5.SPRINKLER SYSTEMS Hl 1. <br /> ❑6.STATIONARY PRESSURIZED CONTAINERS(e.g.,Propane dispensing tank) HI2. <br /> I. EMPLOYEE TRAINING <br /> Explanation of Requirement:Employee training is required for all employees handling hazardous materials and hazardous wastes in day-to-day or clean-up <br /> operations including volunteers and/or contractors.Training must be: <br /> •Provided within 6 months for new hires; <br /> •Amended as necessary prior to change in process or work assignment; <br /> •Given upon modification to the Emergency Response/Contingency Plan,and updated/refreshed annually for all employees. <br /> Required content includes all of the following: <br /> •Material Safety Data Sheets; •Communication and alarm systems; <br /> •Hazard communication related to health and safety; •Personal protective equipment; <br /> •Methods for safe handling of hazardous substances; •Use of emergency response equipment(e.g.Fire extinguishers,respirators, <br /> •Fire hazards of materials/processes; etc.); <br /> •Conditions likely to worsen emergencies; •Decontamination procedures; <br /> •Coordination of emergency response; •Evacuation procedures; <br /> •Notification procedures; •Control and containment procedures; <br /> •Applicable laws and regulations; •UST monitoring system equipment and procedures(if applicable). <br /> Il. <br /> INDICATE HOW EMPLOYEE TRAINING PROGRAM IS ADMINISTERED(Check all that apply) <br /> ® 1.FORMAL CLASSROOM; ❑2.VIDEOS; ❑3.SAFETY/TAILGATE MEETINGS; <br /> ❑4.STUDY GUIDES/MANUALS Specify): 12. <br /> ❑5.OTHER(Specify): 13. <br /> ❑6.NOT APPLICABLE BECAUSE FACILITY HAS NO EMPLOYEES <br /> Large Quantity Generator(LQG)Training Records: Large quantity hazardous waste generators(i.e.,who generate more than 270 gallons/1,000 <br /> kilograms of hazardous waste per month)must retain written documentation of employee hazardous waste management training sessions which includes: <br /> •A written outline/agenda of the type and amount of both introductory and continuing training that will be given to persons filling each job position having <br /> responsibility for the management of hazardous waste(e.g.,labeling,manifesting,compliance with accumulation time limits,etc.). <br /> •The name,job title,and date of training for each hazardous waste management training session given to an employee filling such a job position;and <br /> •A written job description for each of the above job positions that describes job duties and the skills,education,or other qualifications required of personnel assigned <br /> to the position. <br /> •Current employee training records must be retained until closure of the facility. <br /> •Former employee training records must be retained at least three years after termination of employment. <br /> J. LIST OF ATTACHMENTS <br /> (Check one of the following) n. <br /> [11.NO ATTACHMENTS ARE REQUIRED;or <br /> ❑2.THE FOLLOWING DOCUMENTS ARE ATTACHED: J2. <br /> K. SIGNATURE/CERTIFICATION <br /> Certification:Based on my inquiry of those individuals responsible for obtaining the information,I certify under penalty of law that I have personally examined and <br /> am familiar with the information submitted and believe the information is true,accurate,and complete,and that a copy is available on site. <br /> SIGNATURE OF OWNER/OPERATOR DATE SIGNED Kl. <br /> NAME OF SIGNER(print) K2. TITLE OF SIGNER K3 <br /> Billy Dayon Site Manager <br /> CDMS.LM.02/11/13 <br />