My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TENTH
>
150
>
2900 - Site Mitigation Program
>
PR0505598
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2020 10:25:12 AM
Creation date
7/1/2020 9:43:58 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0505598
PE
2950
FACILITY_ID
FA0006889
FACILITY_NAME
AMERICAN SAVINGS & LOAN
STREET_NUMBER
150
Direction
W
STREET_NAME
TENTH
STREET_TYPE
ST
City
TRACY
Zip
95376
APN
23505402
CURRENT_STATUS
01
SITE_LOCATION
150 W TENTH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
163
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CRC ENVIRONMENTAL RISK MANAGEMENT, INC. <br /> HEALTH AND SAFETY PLAN <br /> CLIENT: American Savings Bank <br /> SITE ADDRESS: 150 West 10th Street, Tracy, California 95376 <br /> CLIENT CONTACT: PHONE: <br /> PROPOSED START DATE: March 1995 PROPOSED DURATION: One (1) Day <br /> PROJECT SUPERVISOR: Ronnie Almero <br /> 1.0 PURPOSE <br /> The purpose of the site Health and Safety Plan (HASP) is to provide CRC Environmental <br /> Risk Management, Inc. (CRC) field personnel and subcontractors with an understanding of <br /> the potential chemical and physical hazards that exist or may arise while the tasks of this <br /> project are being performed. <br /> This HASP describes the procedures to be followed in order to reduce employee exposure to <br /> potential health hazards which may be present at the project site. The emergency response <br /> procedures necessary to respond to such hazards are also described within this HASP. <br /> 2.0 OBJECTIVE <br /> The primary objective is to ensure the well-being of all field personnel and the community <br /> surrounding this site. In order to accomplish this, project staff and approved subcontractors <br /> shall acknowledge and adhere to the policies and procedures established herein. Accordingly, <br /> all personnel assigned to this project shall read this site Health and Safety Plan and sign the <br /> Acknowledgement Statement (Appendix A) to certify that they have read, understood and <br /> agreed to abide by its provisions. <br /> All subcontractors employed directly by CRC are responsible for compliance with the <br /> requirements of this HASP and shall assure compliance with this HASP by all their officers, <br /> agents, employees and subcontractors. CRC personnel have the authority to stop work <br /> performed by the subcontractors at this site if any work is not performed in accordance with <br /> the requirements of this HASP. <br /> CRC Environmental Risk Management,Inc. Project No. 2100-217-2 <br /> American Savings Bank 150 West 10th Street <br /> February 15, 1995 Tracy, California <br />
The URL can be used to link to this page
Your browser does not support the video tag.