Laserfiche WebLink
Other Project Field Staff: <br /> Responsibilities Include: <br /> • Adherence to this HASP during all field activities. <br /> • Communicating its requirements to subcontractors and ensuring their <br /> compliance. <br /> • Informing the FSS and the project manager of any health or safety related <br /> questions or issues that arise in the course of the field work. <br /> Subcontractors: <br /> Responsibilities include: <br /> • Adherence to this HASP during all field activities or to more stringent <br /> requirements imposed by their own guidelines. <br /> • Submission of documentation for training, medical surveillance and respirator <br /> fit testing requirements to the FSS prior to initiation of on-site activities. <br /> 6,0 HAZARDS EVALUATION <br /> The process of collecting subsurface samples by drilling, coring or trenching involves <br /> potential exposure to environmental contaminants. Potential chemical contaminants include <br /> petroleum hydrocarbon products such as gasoline, diesel, hydraulic fluid, solvents, <br /> polychlorinated biphenyls, heavy metals, pesticides and other chemicals. <br /> Physical hazards will be involved in the operation of equipment used for the collection of <br /> subsurface samples. Equipment that may be used on the job site may include drill rigs, steam <br /> cleaners, pressure washers, drum dollies, backhoes, compressors and other equipment. <br /> Potential hazards also include encountering buried utilities such as gas, electrical, sewer, <br /> water, telephone and cable television lines during drilling or trenching operations. Similarly, <br /> striking a buried container of hazardous materials can result in very high contaminant <br /> exposure and/or fire and explosion hazards. <br /> 6.1 Contaminant/Waste Characteristics: <br /> General Forms: ® Solid ❑ Sludge <br /> ❑ Liquid ® GasNapor <br /> Possibility of encountering soil and/or groundwater contaminated with one or more <br /> of the following: <br /> CRC Environmental Risk Management,Inc. Project No.2100-217-2 <br /> American Savings Bank 150 West IOth Street <br /> February 15, 1995 8 Tracy, California <br />