Laserfiche WebLink
HL <br /> dvtu <br /> Ver. 1 -E-doc-3-18-10 <br /> Ther t Qualified Facility ` SPC C Plan MAR 0 2 2016 <br /> ENVRONME <br /> WTI . <br /> This template constitutes the SPCC Plan for the facility , when completed and signed by the owner br operator of a <br /> facility that meets the applicability criteria in § 112 . 3 ( g ) ( 1 ) . This template addresses the requirements of 40 CFR part 112 . <br /> Maintain a complete copy of the Plan at the facility if the facility is normally attended at least four hours per day , or for a <br /> facility attended fewer than four hours per day , at the nearest field office . When making operational changes at a facility <br /> that are necessary to comply with the rule requirements , the ownerloperator should follow state and local requirements <br /> (such as for permitting , design and construction ) and obtain professional assistance , as appropriate . <br /> Facility Description <br /> Facility Name J M Equipment Co . , Inc Business Facility <br /> Facility Address 321 Spreckels Ave <br /> City Manteca State CA ZIP 95336 <br /> County San Joaquin Tel . Number ( 209 ) 522 - 3271 <br /> Owner or Operator Name J M Equipment Co Inc <br /> Owner or Operator Address 321 Spreckels Ave <br /> City Manteca State CA ZIP 95336 <br /> County San Joaquin Tel . Number ( 209 ) 522 - 3271 <br /> I . Self-Certification Statement (§ 112 . 6( a ) ( 1 ) ) <br /> The owner or operator of a facility certifies that each of the following is true in order to utilize this template to comply <br /> with the SPCC requirements : <br /> I Rowie Sizemore certify that the following is accurate : <br /> 1 . 1 am familiar with the applicable requirements of 40 CFR part 112 ; <br /> 2 . 1 have visited and examined the facility ; <br /> 3. This Plan was prepared -in accordance with accepted and sound industry practices and standards ; <br /> 4 . Procedures for required inspections and testing have been established in accordance with industry inspection <br /> and testing standards or recommended practices ; <br /> 5 . 1 will fully implement the Plan ; <br /> 6 . This facility meets the following qualification criteria ( under § 112 . 3 ( g ) ( 1 ) ) : <br /> a . The aggregate aboveground oil storage capacity of the facility is 10 , 000 U . S , gallons or less ; and <br /> b . The facility has had no single discharge as described in § 11241 ( b) exceeding 1 , 000 U . S . gallons and no <br /> two discharges as described in § 112 . 1 ( b ) each exceeding 42 U . S . gallons within any twelve month period <br /> in the three years prior to the SPCC Plan self-certification date , or since becoming subject to 40 CFR part <br /> 112 if the facility has been in operation for less than three years ( not including oil discharges as described <br /> in § 112 . 1 ( b ) that are the result of natural disasters , acts of war , or terrorism ) ; and <br /> c . There is no individual oil storage container at the facility with an aboveground capacity greater than 5 , 000 <br /> U . S . gallons . <br /> 7 . This Plan does not deviate from any requirement of 40 CFR part 112 as allowed by § 112 . 7 ( a ) ( 2 ) (environmental <br /> equivalence) and § 112 . 7 ( d ) ( impracticability of secondary containment) or include any measures pursuant to <br /> § 112 . 9(c) (6) for produced water containers and any associated piping ; <br /> 8 . This Plan and individual ( s ) responsible for implementing this Plan have the full approval of management and I <br /> have committed the necessary resources to fully implement this Plan . <br /> Facility Name: J . M . Equipment Co . , Inc . Bus Fac, Page 1 Tier I Qualified Facility SPCC Plan <br />