Laserfiche WebLink
Ver. I -&doo-3- 1 & 10 <br /> Table G40 General Rule Requirements for Onshore Facilities NIA ' <br /> Each container is provided with a system or documented procedure to prevent overfills for the container. x X <br /> Describe : <br /> Liquid level warning device is placed on all bulk AST ' s I <br /> Always check level gauge to prevent tank overfilling . p <br /> Always seal and mark full containers using self-adhesive stickers provided . 1 <br /> If an oil spill occurs , the spill kit or absorbent, or both will be used to contain and fully clean up the spill <br /> Liquid level sensing devices are regularly tested to ensure proper operation (See Inspection Log and x EJ <br /> Schedule in Attachment 3 . 11 . (§ 11246(a) (3) (N)J <br /> Visible discharges which result in a loss of oil from the container, including but not limited to seams , X <br /> gaskets , piping , pumps , valves , rivets , and bolts are promptly corrected and oil in diked areas is promptly <br /> removed . j§§ 112. 8(c) (10) and 112. 12(c) (10)J <br /> Aboveground valves , piping , and appurtenances such as flange joints , expansion joints , valve glands and ❑ X <br /> bodies , catch pans , pipeline supports , locking of valves , and metal surfaces are inspected regularly . (See <br /> Inspection Log and Schedule in Attachment 3 . 1 ] j§§ 112. 8(d) (4) and 112. 12(d) L4 <br /> Integrity and leak testing are conducted on buried piping at the time of installation , modification , ❑ X <br /> construction , relocation , or replacement. [See Inspection Log and Schedule in Attachment 3 . 11 <br /> £§§ 112. 8(4) (4) and 112. 12(d) (4)J <br /> MAR 0 2 2015 <br /> 1 A <br /> r . { jTWr4rt i F5rm3 <br /> Facility Name : J . M . Equipment Co . , Inc. Bus Fac. Page 11 Tier I Qualified Facility SPCC Plan <br /> t <br /> I <br /> i <br /> t <br />