My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_REMEDIATION COMPLETION REPORT
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
29008
>
2900 - Site Mitigation Program
>
PR0539479
>
ARCHIVED REPORTS_REMEDIATION COMPLETION REPORT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2020 12:01:29 PM
Creation date
7/2/2020 9:18:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
REMEDIATION COMPLETION REPORT
RECORD_ID
PR0539479
PE
2950
FACILITY_ID
FA0022575
FACILITY_NAME
THORNTON DEHYDRATOR STATION
STREET_NUMBER
29008
Direction
N
STREET_NAME
THORNTON
STREET_TYPE
RD
City
THORNTON
Zip
95686
CURRENT_STATUS
01
SITE_LOCATION
29008 N THORNTON RD
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
415
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Contents <br /> Acronyms and Abbreviations " <br /> ..................................................................................................iii <br /> 1.0 Introduction.....................................................................................................................1-1 <br /> 2.0 Background......................................................................................................................2-1 <br /> 2.1 Project Roles and Responsibilities.......................................................................2-1 <br /> 3.0 Field Activities................................................................................................................3-1 <br /> 3.1 Summary of Field Activities.................................................................................3-1 <br /> 3.2 Sampling for Disposal Pre-acceptance................................................................3-1 <br /> 3.3 Pre-construction Monitoring Well and Piezometer Abandonment................3-2 <br /> 3.4 Site Preparation/Demolition................................................................................3-2 <br /> 3.5 Northern Perimeter Soil Sampling......................................................................3-3 <br /> 3.6 Soil Excavation.......................................................................................................3-3 <br /> 3.7 Results......................................................................................................................3-4 <br /> 3.7.1 Sampling for Disposal Pre-acceptance...................................................3-4 <br /> 3.7.2 Northern Perimeter Soil Sampling.........................................................3-4 <br /> 3.7.3 Verification Sampling...............................................................................3-5 <br /> 3.8 Backfilling and Site Restoration...........................................................................3-7 <br /> 3.9 Monitoring Well Installation................................................................................3-7 <br /> 4.0 Conclusions......................................................................................................................4-1 <br /> 5.0 References........................................................................................................................5-1 <br /> Tables <br /> 1 Results of Landfill Pre-acceptance Soil Sampling <br /> 2 Results of Northern Perimeter Soil Sampling <br /> 3 Results of Verification Soil Sampling <br /> 4 Results of Import Soil Sampling <br /> Figures <br /> 1 Site Location Map <br /> 2 Demolition Plan and Northern Perimeter Sample Results <br /> 3 Proposed Excavation Plan <br /> 4 Excavation Limits and Verification Sample Location <br /> 5 Site Restoration and New Well Locations <br /> Appendices <br /> A Site Photographs <br /> B Permits <br /> C Well Records <br /> D Waste Manifests <br /> E Analytical Reports and Chain-of-Custody Documents <br /> SFO1(THORNTON COMPLETION REPORT_6.21-05.DOC) i <br />
The URL can be used to link to this page
Your browser does not support the video tag.