Laserfiche WebLink
y <br /> PROJECT NUMBER WELL NUMBER <br /> ` 143626.B1.FW 120 PZ-2 SHEET 1 OF 1 <br /> CH2MHILL <br /> WELL COMPLETION DIAGRAM <br /> PROJECT: PG&E Gas GatheringLOCATION: THORNTON <br /> DRILLING CONTRACTOR_Greg Drilling----..-_.__ <br /> P DRILLING METHOD AND EQUIPMENT USED: Hand Auger <br /> WATER LEVELS: START: 11/26/97 END: 11/26/97 LOGGER: T.Poe <br /> i <br /> 3 <br /> 2 1\ 1- Ground elevation at well Ns <br /> 2- Top of casing elevation 102.17 <br /> rs 3-Wellhead protection cover <br /> 8 1.6' type Christy Box <br /> 4- a) Diameter of well casing 2" <br /> � <br /> 4.6' <br /> b) Material Schedule 40 PVC <br /> � las' <br /> 4 5- a)Diameter of well screen 2" <br /> b)Material Schedule 40 PVC/0.01" <br /> 5 6- Type of screen filter #2/12 Lonestar Sand <br /> 7- Type of seal Bentonite Chips <br /> 10' 6 8- Grout mix Portland Cement <br /> i <br /> C <br /> Remarks: <br /> 1436261reports\wellrnmplete\wells'\pthommn.xls 120 PZ-2j <br />