My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TENTH
>
241
>
4100 – Safe Body Art
>
PR0543442
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2024 3:54:44 PM
Creation date
7/3/2020 10:14:19 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4100 – Safe Body Art
File Section
COMPLIANCE INFO
RECORD_ID
PR0543442
PE
4120 - BODY ART FACILITY-SINGLE USE
FACILITY_ID
FA0024652
FACILITY_NAME
MAKEUP MAU LOA (SEPULVEDA, BRIANA)
STREET_NUMBER
241
Direction
E
STREET_NAME
TENTH
STREET_TYPE
ST
City
TRACY
Zip
95376
CURRENT_STATUS
Inactive, non-billable
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
FilePath
\MIGRATIONS\BA\BA_4120_PR0543442_241 E TENTH_.tif
Site Address
241 B E TENTH ST TRACY 95376
Suite #
B
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Body Art InspectieReport <br /> Date: 3 I L 1 rZ 0 <br /> San Joaquin County Environmental Health Department <br /> Program <br /> 1868 E.Hazelton Ave.,Stockton,CA 95205 Record: p rZQ 5 q 34 q,Z <br /> (209)468-3420 <br /> .,�•. 1.p Program <br /> q�i?oR°'` www-siogv.org/ehd <br /> Element: <br /> PR Number PRACTITIONER/ARTIST NAME PR Number PRACTITIONER/ARTIST NAME <br /> Briana Sepulveda Permit and BBP posted <br /> PR0542097 (BBP exp.3/1/20) <br /> PR0545350 Monica Levario(BBP exp.8/8/20 <br /> Rachel Cadena Permit and BBP posted(BBP exp. <br /> PRO545167 3/1/20) <br /> Observations and Corrective Actions: <br /> 35. Operation and employee training records shall be maintained for 3 years and made available for inspection. A written <br /> Infection Prevention and Control Plan (IPCP) shall be maintained, followed and updated. HSC 119313—The IPCP was not <br /> updated. Update the business address on the IPCP and remove sterilization information on the IPCP. Submit a copy of <br /> the updted IPCP to the EHD. <br /> 35. Operation and employee training records shall be maintained for 3 years and made available for inspection. A written <br /> Infection Prevention and Control Plan (IPCP) shall be maintained, followed and updated. HSC 119313—Training records were <br /> not available. Provide training records to the EHD. <br /> All corrections are due by March 20, 2020. <br /> Notes: <br /> 1. Briana completed the BBP training from AboveTraining.She will submit and post the new certificate when <br /> she receives it. <br /> 2.Sterilization certificates and invoices were provided for the needles used. <br /> 3. Post Monica Levario's BBP and permit. <br /> Reinspecion on/about: A reinspection fee of$152 per hour may be charged. Page 2 of 2 <br /> EH-11/17 <br /> C� <br />
The URL can be used to link to this page
Your browser does not support the video tag.