My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
5308
>
4100 – Safe Body Art
>
PR0544021
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/26/2024 10:44:45 AM
Creation date
7/3/2020 10:14:38 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4100 – Safe Body Art
File Section
COMPLIANCE INFO
RECORD_ID
PR0544021
PE
4120
FACILITY_ID
FA0025033
FACILITY_NAME
XOCHICALCO TATTOOS & COSMETICS
STREET_NUMBER
5308
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
CURRENT_STATUS
02
SITE_LOCATION
5308 PACIFIC AVE STE 20A
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
FilePath
\MIGRATIONS\BA\BA_4120_PR0544021_5308 PACIFIC_.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sent from Yahoo Mail for iPad <br /> On Thursday, March 4, 2021 , 9 : 58 AM, Singh, Sandip [EHD] <ssingheh@sigov.org> wrote : <br /> Good Morning Gerardo, <br /> Is there a certain distance sinks have to be from a station? <br /> The Safe Body Art Act does not specify a distance between the sinks and <br /> stations/ procedure areas. However, it does specify that there should be one sink <br /> per two practitioners. <br /> What are the requirements for an autoclave room? I know we need a door, sink, <br /> auto clave, dry rack, and drawers to fit pre sterilization packs, log, and cleaning <br /> supplies. What other requirements do we need? <br /> The Program Coordinator, Robert McClellon , is not in the office for the rest of the <br /> week. I will check with him to see if there is anything else that is needed. <br /> Would you be able to stop by April for inspection? We're going to make the <br /> improvements this month <br /> We can schedule the inspection for April , that's no problem . <br /> So , besides installing extra sinks, adding procedure chairs/ tables and a <br /> sterilization room , are there any other changes that you 're planning on making? <br /> From : gerardo Rivera <gerardo52riveraayahoo. com > <br /> Sent: Wednesday, March 3 , 2021 8: 58 PM <br /> To : Singh , Sandip [EHD] <ssinghehCcilsigov. org> <br /> Subject: Re: Shop reopening <br /> CAUTION : This email is originated from outside of the organization. Do not click links or <br /> open attachments unless you recognize the sender and know the content is safe. <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.