My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
2738
>
4100 – Safe Body Art
>
PR0537413
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/8/2024 10:00:12 AM
Creation date
7/3/2020 10:15:23 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4100 – Safe Body Art
File Section
COMPLIANCE INFO
RECORD_ID
PR0537413
PE
4121
FACILITY_ID
FA0021512
FACILITY_NAME
IN 2 SKIN TATTOO (AGUIRRE, SANDY)
STREET_NUMBER
2738
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95204
APN
12504002
CURRENT_STATUS
01
SITE_LOCATION
2738 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
FilePath
\MIGRATIONS\BA\BA_4121_PR0537413_2738 PACIFIC_.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
149
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0400200100051 rev 01.1 .01.01 Page:1 of 1' <br /> ETQ Sterilisation Certificate <br /> ARM General Information <br /> k MA Sterilization No. 11447111 <br /> wk9Vr/i7*'4 (AUVI) TATSOUL SPEARMAN,INC. <br /> Customer name/order NO.(delivery note) <br /> &Vit H Date of reception 2014-07-09 <br /> 141,*AM Temperature of Environment 22'C <br /> A 4�k Name of proudct fV if , 4 Type/Model j",-tr, �} Product LOT M V Gases <br /> TATTOO NEEDLE 140701 60CS <br /> it,901k Physical Process Data <br /> r,1t�i!!11• fH Preconditioning time 9 h <br /> X iA 0 W Date of sterilization 201407-1 <br /> 7C9K v; Chamber No, 1 <br /> Xff Sterilization No 11407111 <br /> V WflffnJ Aeration time 12 h <br /> The detail date of the preconditioning,sterilization aeration process please refers to GOALS. <br /> A&#VEglJM:* Result of physical process control <br /> fnb , X1w%j+too CA&MM*A A VGBS on*- <br /> The physical acceptance criteria of the preconditioning,the cycle and tate aeration were in <br /> compliance with the validated s&nifications of cycle no.tOB& <br /> OtWURVAk Microbiological Process Data <br /> 1"KM, <br /> The microbiological process control with biological indicators has been performed according to the <br /> BI sterility test SOP 032005 <br /> J�M�#Alit`IN19�`Bl- ;;�1: ��� Biological Indicator strip <br /> No of biological indicators 19 per chamber load. j*f- , Manufacture:Future <br /> Mt till-OT.: 140705 <br /> jr'& Ex iration DaW 20159704 <br /> 15 V,H M Date of incubation 201407-11 <br /> ti 1i *ft Incubation conditions 7 days at 35f2'C, <br /> 0103IRMA Result of microbiological process control <br /> > TC37i-i <br /> Y No arowth from Bacillus subtilis has been detected. <br /> *�p Remarks: <br /> j5;%ffjYAMtM GOALS OA <br /> AfT q N] Date of release: Si ti tre/ <br /> r <br />
The URL can be used to link to this page
Your browser does not support the video tag.