My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1975-2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SHELLEY
>
4545
>
4500 - Medical Waste Program
>
PR0450024
>
COMPLIANCE INFO_1975-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2025 2:48:59 PM
Creation date
7/3/2020 10:18:45 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4500 - Medical Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
1975-2015
RECORD_ID
PR0450024
PE
4524
FACILITY_ID
FA0002493
FACILITY_NAME
GOLDEN LIVING CENTER HY-PANA
STREET_NUMBER
4545
STREET_NAME
SHELLEY
STREET_TYPE
CT
City
STOCKTON
Zip
95207
APN
10425005
CURRENT_STATUS
01
SITE_LOCATION
4545 SHELLEY CT
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
FilePath
\MIGRATIONS\MW\MW_4524_PR0450024_4545 SHELLEY_.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
254
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LOCKOUT TAGOUT POLICY AND PROCEDURES <br />4 <br />P. a <br />living centers <br />Attachment "C" <br />Outside Contractors' Policy and Procedures for Hazard Communication <br />And Lockout/Tagout <br />Policy <br />All outside contractors working in the facility will be briefed on the Hazard Communication and <br />lockout/tagout program and procedures that they will be required to follow. If the outside <br />contractors will be using their own Hazard Communication and lockout/tagout procedures, they <br />must brief the appropriate personnel. <br />Checklist <br />The checklist below must be completed each time services are to be performed by outside <br />contractors. Check off each stop as it is completed and attach to the Contractor <br />Acknowledgement Form. <br />Gotden Living I OCKOUTITAGOUT Page 9 of 10 <br />Procedure <br />1. Discuss the services to be performed by the outside contractor and the time frame <br />for the completion of the work. (This could be a one time job or monthly <br />procedure. <br />2. Use a floor plan of the facility to determine the locations in or around the facility <br />that will be affected by the work to be performed. <br />3. Determine the equipment and the employees that will be affected. <br />4. Review the Hazard Communication policy and how the contractor will be <br />affected. (Review the facility container labeling system, access to and location of <br />MSDS's, and any potential for chemicals in unlabeled pipes) <br />5. Review lockout/tagout policy and procedures. <br />6. Discuss and ensure that adequate worksite stands, signs or barricade tape are used <br />to secure the worksite as needed. Discuss any additional precautions necessary for <br />resident safety. <br />7. Have the contractor provide proof of insurance coverage according to the <br />guidelines established by the legal contracting department. <br />8. Make sure the general contractor understands that he/she is responsible for <br />insuring that these procedures are followed by his/her employees and/or any sub <br />contractors. <br />9. Have the contractor sign the acknowledgement form. Attach this completed <br />checklist to the signed acknowledgement and retain a copy in the Maintenance <br />Supervisor's office. <br />Gotden Living I OCKOUTITAGOUT Page 9 of 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.