Laserfiche WebLink
0 <br />I BFI Medical Waste S <br />Sid Proposal vstems of C., Inc. <br />-4- <br />7�1 <br />Attachment C <br />Contract Number MLT97p00 <br />THE FOLLOWING INSTITUTIONS CURRENTLY HAVE CONTRACTS IN PLACE THAT <br />'HILL NOT BE EXPIRING UNTIL JUNE 30, <br />198. <br />SERVICE THESE INSTITUTIONS TIL JULY 1, 19998 THROUGH JUONE 30, 199SHA9 NOT <br />f^01 fcr1l�wit w <br />—IL-11 vrU'flA AAE IC;AL FACILITY <br />aSCRIPTIONFPEQUEN `Y ESTIMATED <br />SCHEOULED SERVICE �`-- ANT Y <br />Complete work per pound 52 x 4000 lbs. x <br />TOTAL COST (A) + (B) = <br />Cril --/1.. <br />QESCR1P11QN EREQU NCY <br />SCHEDULED SERVICE <br />Complete work per pound 52 x <br />EMERGENCY SERVICE <br />Complete work per pound 6 x <br />PRICE PER <br />PQ -v ND T TALC S37 <br />S • 19 = S 39502 .00 Ia} <br />39,502.00 <br />ESTIMATED PRICE PER <br />-QUANTITY PQ1NQ TOTAL .nal <br />110 lbs. <br />x <br />S <br />• 19 <br />= g <br />1086.80 <br />(�) <br />40 lbs. <br />x <br />s <br />.02 <br />= S <br />4.80 <br />(e) <br />TOTAL COST (A) + (e) = 1091.60 <br />CALIFORNIA STATE PRISON - SAN UNTIN <br />QESCRIPTION � ESTIMATED PRICE PER <br />SCHEDULED SERVICE <br />FREQUENCY ANTITY F T_O <br />ND TAL COST <br />Complete work per pound <br />52 x 300 lbs. x 5 •45 = S 7020. oo (A} <br />-MERGENCY SERVICE <br />Complete work per pound 10 x 300 lbs. x 3 -10 = S 300.00 <br />(B) <br />TOTAL COST (A) + (B) e 7320.00 <br />CALIFORNIA STATE PRISON - SOLAN <br />D_I:SC4IPTION ESTIMATED PRICE PER <br />FREQ�!l:NCY ANTTY POUND �TAL cn <br />SCHEOULED SERVICE <br />Complete work per pound 52 x. 300 lbs. x $ 19____ = S 2964.00 (A) <br />EMERGENCY SERVICE <br />�:omplete work per pound 6 • x 300 lbs. Y $ -02 <br />= S 36.00 <br />IBI <br />TOTAL COST () + (B) 3000.00 <br />