Laserfiche WebLink
Inspections Inspections <br /> —Incompatibles stored together —Remedial actions taken in response to inspection findings <br /> —Containers outside of secondary containment —Follow up verification of remedial action <br /> —Secondary containment not clean and dry Inspection documentation should be maintained for <br /> —Inadequate aisles ace <br /> q p at least three years. <br /> —Blocked emergency equipment <br /> • Inspections must be documented and indicate: <br /> —Inspector's Name <br /> —Date of inspection <br /> —Items that were inspected <br /> i <br /> Training Training <br /> • Any employee generating,storing, —Emergency equipment inspection procedure <br /> handling or containerizing hazardous —Shutoff systems and shutdown procedures <br /> waste is required to receive training —Communication and alarm systems <br /> ensure that they are familiar with th0e. • Facility personnel shall complete the training <br /> —Regulatory requirements of hazardous within six months. <br /> waste <br /> —Contingency plan • Annual refresher training is also required. <br /> —Emergency procedures <br /> —Emergency equipment and systems <br /> Waste Shipment Samples <br /> • In order to remove • A sample collected for the sole purpose of testing to <br /> hazardous waste from the determine its characteristics or composition,is not <br /> subject to Title 22 requirements. <br /> site,it must be: s • The samplerand laboratoryshall assurethatthe <br /> —Sampled following information accompanies the sample: <br /> —Profiled,and _: —The sample collector's name,mailing address,and <br /> telephone number <br /> —Manifested The laboratory's name,mailing address,and telephone <br /> number <br /> 9 <br />