Laserfiche WebLink
I <br /> Universal Waste Universal Waste <br /> In addition to the previous requirements large quantity —The 25 par day exemption to dispose of lamps in dumpsters Is no <br /> generators longer In effect <br /> —Computer screens(CRT)are also no longer allowed to be disposed of in <br /> —Hold 11,000 pounds or more of total universal waste at any one time dumpsters and must be recycled through an approved facility <br /> —Are required to notify the EPA and obtain a hazardous waste <br /> Identification number before the total amount of universal waste <br /> onsite exceeds 11,000 pounds <br /> —Must only ship UHW to another universal waste handier,an authorized <br /> hazardous waste disposal site,or an authorized hazardous waste <br /> recycler <br /> —Must keep records of shipments both received and shipped offsite for <br /> at feast three years <br /> I <br /> Contingency Plan Contingency Plan <br /> i As a generator of hazardous waste,the company must have a The following information must be included in the <br /> Contingency plan which outlines the procedures to follow when enc Contin Plan <br /> responding to an emergency involving hazardous Contingency <br /> materials/hazardous waste. —A description of the actions that facility personnel will take <br /> • In accordance with the definition provided in Title 22,a to respond to an emergency so as to"minimize hazards to <br /> Contingency Plan is"a document setting out an organized, human health and the environment from fires,explosions, <br /> planned,and coordinated course of action to be followed In the or any unplanned release of hazardous waste to air,soil,or <br /> event of a fire,explosion or release of hazardous waste or surface water" <br /> hazardous waste constituents which could threaten human <br /> health or the environment" —Arrangements agreed to by local police departments,fire <br /> departments,hospitals,contractors,and State and local <br /> emergency response teams to coordinate emergency <br /> response efforts <br /> Contingency Plan <br /> —Names and addresses(office and home)of emergency <br /> coordinators <br /> —A list of emergency response equipment and <br /> decontamination equipment <br /> -This list must include the location and physical description of each <br /> type of equipment and a brief outline of the equipment's <br /> capabilities <br /> —An evacuation plan which should Include signals to be used <br /> to begin an evacuation,evacuation routes,and alternative <br /> evacuation routes <br /> 13 <br />