My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
15999
>
4400 - Solid Waste Program
>
PR0504215
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2020 9:46:20 AM
Creation date
7/3/2020 10:35:00 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0504215
PE
4430
FACILITY_ID
FA0003934
FACILITY_NAME
Lawrence Livermore National Lab - Site 300
STREET_NUMBER
15999
Direction
W
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
02
SITE_LOCATION
15999 W CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
CField
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4430_PR0504215_15999 W CORRAL HOLLOW_.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
231
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 0 0 0 <br /> (continued from Page 1) the next 5 to 10 years. 8W The final EIS/EIR and related <br /> EIR Public Scoping Process In • Discussion of alternatives to documentation will be used by How can I get involved? <br /> the fall of 1990,DOE and UC asked continued operations. DOE and UC to make a decision <br /> for public input on the Issues to • Descriptions of the existing en- on the proposed actions. Once and mail to the EiS/EIR Of- <br /> Pro <br /> the decisions are made, the DOE Read J ✓ A formal 90-day public review <br /> beanalyzed IntheEIS/EIR.Adver- vironment including, but not limited fice at the address indicated. <br /> tisements in local newspapers an- to:threatened and endangered s e- will h a R of Decision in g a• m nt apublic <br /> p the Federal Re inter,and UC will file Information You may also add your name to hearing will be held on the draft EIS! <br /> pounced the beginning of the public cies,geology,water resources,land �— g <br /> a Notice of Determination with the the mailingIlstbyc isle B.J.he last EIR in the Winter of 1991. These <br /> comment period,andthe public hear- use, and transportation. ger at the number listed on the last <br /> ing. Approximately 280 comments • Projections about environmental State of California Clearinghouse. Information Depositories have been "formal"comments will become part <br /> Po page of this flyer. <br /> were received from 61 interested consequences from the proposed established at eight locations and of the official record forthe project. If <br /> parties during the EIS/EIR scoping action and alternatives with empha- OW A Mitigation Monitoring Plan contain background documents you would like to receive a copy of <br /> comment period. sis on worker and public health. will be prepared for LLNL(as re- pertinent to the EIS/EIR. In addi- Comment on the executive summary of the draft <br /> quired by CEQA}. The Monitoring tion, two of the eight depositories ®• - EIS/EIR EIS/EIR check the box labeled <br /> The EIS/EIR Implementation �' The final EIS/EIR will be pre- Plan will describe the procedures (Livermore Public Library and the MEMO Documents "Send me the draft EIS/EIR <br /> Exe <br /> UC Berkeley Libra will contain all five Summary" on the Mailinnggist <br /> List List <br /> Plan is expected to be released in y ry} form below and return to the EIS/EI R <br /> August 1991. The Implementation documents cited in the draft EIS/ During the EIS/EIR process there Project Office. Copies Summary or me eisiE�R Process EIR and all LLNL reports and stud- are opportunities for the public to J p es of the end- <br /> Plan records the results of the public DOE/UC p plate draft EIS/ElR and all appendi- <br /> scoping process, summarizes the Decision to ies reviewed by the consultants provide both formal and informal <br /> issues raised duringscoping, and Prepare Joint during the preparation of the EIS/ comments. There are several fu- ces will be made available for re- <br /> Prepare <br /> Els/ElR EIR. These additional documents tura o view at all eight information deposi- <br /> discusses the decisions made on Public opportunities for you to com- tories and by written request to B.J. <br /> what will be addressed in the EIS/ scoping will be available September 1991 ment: <br /> Fall 1990 Process through September 1992. Barringer at the E/S/E/RProject Of- <br /> EIR. In addition, the plan provides g p ✓ Informal comments will be ac- fice. <br /> an outline of the EIS/EIR process, Implementation o ceptedontheCommunityRelations �/ In addition, general comments <br /> and a brief discussion of the project Plan = Add Your Name Plan. If you would like to receive a <br /> informal ® and questions are welcome through- <br /> alternatives. The plan will be placed summer 1991 Public Review _ t0 the Copy Of the Community Relations out the process. <br /> in the information depositories for - _ ° Mailing List Plan check the box labeled"Send <br /> the public to review. (For depository -_ met e Community Relations Plan" <br /> draft EIS/EIR Formal <br /> locations, refer to the list on the last Public Review If you are already on the LLNL or on the Mailing List form below and Request Speakers <br /> page of this flyer.) winter 1991 and Comment SNL,Livermore mailing list,you will return to the EIS/EIR Project Office. • to Address Your <br /> DOE and UC receive information flyers at key ("Informal" comments are consid- Organization <br /> Ow The EIS/EIR Project Commu- final EIS/EIR Decision points throughout the EIS/EIR proc- ered by DOE and UC,but do not be- <br /> nity Relations Plan will be re- Fall 1992 Mawng ess. If you are not already on the come part of an official record.) Call the EIS/EIR Project Public Af- <br /> leased in July 1991 and will be <br /> mailing list and would like to be of Informal comments will also be fairs Office at(415)423-3104 to ar- <br /> placed in the information deposi- added: accepted on the Implementation range for an EIS/EIR Project staff <br /> • <br /> tories. The Community Relations DoE uc Complete the attached "Com- <br /> Plan during the summer of 1991 member to brief your group or or- <br /> Plan describes: Record of Notice of munit y Relations Mailing List"form. prior to the release of the draft EIS/ ganization about the project. <br /> Decision Determination Place a$.19 stamp on the form <br /> • Local community background; EIR. <br /> • LLNL and SNL, Livermore in- <br /> volvement with the community; ------------------------- <br /> • EIS/EIR community involvement r Community Relations Mailing List <br /> activities to date;and pared after the formal public re- formonitonngtheimplementation of � <br /> • Community involvement activi- <br /> view and comment period on the the mitigation measures. Although Name: <br /> draft EIS/EIR. Part of that docu- a formal review and comment pe- .... <br /> ties planned conjunction with fu- ment addresses all written com- riod on this plan is not required,it will ( Organization: <br /> tore EIS/EIR activities. ments and oral testimony received be available in the information de- <br /> during the public comment period. positories. Street Address: <br /> The draft EIS/EIR is expected Before DOE can make a decision <br /> to be Issued in November 1991 on the continued operation of LLNL Mitigation measures will be de- City: State: Zip: <br /> for a 90-day public review and and SNL, Livermore, and the alter- scribed in the EIS/EIR. However,if <br /> comment period. A public hearing natives,a Notice of Availability must the action selected by DOE includes I Please check the following boxes as appropriate: <br /> is scheduled for January 1992. The be published in the Federal Regis- mitigation measures, DOE will pre- I ❑ Add my name/organization to the general community relations mailing list. <br /> draft EIS/EIR will include: lu. Before a decision can be made pare a separate Mitigation Action 0 ❑ Send me the Community Relations Plan. <br /> • Discussion of current operations onwhetherornot to renewtheircon- Plan. The Action Plan would de- ❑ Send me the draft EIS/EIR Executive Summary when published. <br /> at the LLNL Livermore Site and Site tract with DOE, the UC Regents scribe the measures to be taken to <br /> 300, and SNL, Livermore. must certify that the final EIS/EIR avoid or minimize impacts identified ❑ Correct my address. The correct address is written above. <br /> • Review of projects proposed in document is adequate. in the EIS/EIR. ❑ Delete my name/organization from the community relations mailing list. <br /> Page 2 E/S✓EIR Overview July 1991 EIS/EIR Overview July 1991 Page 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.