My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
15999
>
4400 - Solid Waste Program
>
PR0504215
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2020 9:46:20 AM
Creation date
7/3/2020 10:35:00 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0504215
PE
4430
FACILITY_ID
FA0003934
FACILITY_NAME
Lawrence Livermore National Lab - Site 300
STREET_NUMBER
15999
Direction
W
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
02
SITE_LOCATION
15999 W CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
CField
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4430_PR0504215_15999 W CORRAL HOLLOW_.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
231
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 <br /> STATE OF.CALIFORNIA GEORGE DEUKMEJIAN Governor <br /> ALIFORIA REGIONAL WATE UALITY CONTROL BOARD— <br /> CENTRAL <br /> OAR —CENTRAL VALLEY REGION `R <br /> 3443 ROUTIER ROAD <br /> SACRAMENTO,CA 95827-3098 <br /> 31 December 1987 <br /> Mr. Robert 0. Godwin, Associate Director <br /> University of California <br /> Lawyonce. Livermore Notional Laboratory <br /> P. 0. Box 80,21 <br /> Livermore, CA 1)4550 <br /> REPORT OF RECENT INSPECTION, U111VERSITY OF CALIFORNIA, LAWRE110E LIVERNIGRE <br /> NATIONAL LABORATORY SITE 300, SAN JOAQUIN COUNTY <br /> The enclosed inspection report describes the 30 October 1987 meeting and <br /> inspection by Regional Board staff of' La'w'rence 'Livermore National Laboratory <br /> (LLNL) Site 300. <br /> At the meeting we discussed the draft Environmental Restoration Mork Plan which <br /> was provided that day. We discussed some portions of the work plan at that <br /> time, and I subsequently provided detailed comments to Albert Lamarre of your <br /> staff by telephone on 4 November 1987. The final work plan, which was submitted <br /> 4 December 1987, is acceptable with one change which is discussed below. The <br /> work plan and time schedules should be updated in each Environmental Investi- <br /> gations Quarterly Report; please show the new and old versions for easy com- <br /> parison. <br /> One change needed in the work plan is in Task 12 concerning Pit 6. According to <br /> Mr. Lamarre, LLNL implemented the recommendations in Brown and Caldwell 's (B&C) <br /> July 1987 report by installing two new wells in the shallow alluvium near <br /> existing Wells EP 6-9 and K 6-1. Our geologist has reviewed that report, and <br /> while we generally concur with B&C's conclusions and recommendations, we feel <br /> the ground water flow directions are not clear on the pit's west side. Ac- <br /> cording to our geologist, if the ground water follows the topography (the pit <br /> lies on a ridge) , the flow could be southwest as well as southeast. To check <br /> this possibility, a piezometer should be installed on the west side of the pit <br /> south of the fault, and the piezometric water levels reevaluated. <br /> Also, TCE has been found at high levels in two samples from Well BC-13 (100 ppb <br /> and 70 ppb; state action level for TCE is 5 ppb) . This is a shallow well <br /> `� monitoring a spring which discharges to the ground surface at a road cut. The <br />
The URL can be used to link to this page
Your browser does not support the video tag.