Laserfiche WebLink
ECTIONS OF OCUENT . <br /> ✓ The Draft EIS/EIR is about vtILUME I• SECTIONS V0L1 ME II-APPENDfiCES <br /> 2,200 pages long; is divided into <br /> 10 major topical sections with 13 Executive Summary t1 De ...M...... <br /> mg=sand <br /> 1 .Purpose and Need for the Pro- Facies <br /> supporting appendices; and in- posed'Acuon I3 Wake ement <br /> cludes an Executive Summary, 2 Overview. Environment;Safety;andlElealth <br /> Glossary, List of Abbreviations 3 Proposed Action and Alterna- D Accident Analysis <br /> and Acronyms, List of Preparers, aves E (Reserved for `uttlre.... <br /> 4 <I>escription of the Existing fin- F Ecology and Biolal Assessment <br /> References, and an Index. The vironment G Floodplain wand Wetlands 'Assess <br /> sections and appendices are out- 5 ; Environmental Consequences ment <br /> lined in the box to the right. Unavoidable AdverseEnviron- H PrehistorrcatfdHisstoricC vralRe <br /> mental Impacts sources <br /> 7Short Term Uses and Long I Seismic Safely Program <br /> ✓ The 66a e Executive Sum- <br /> P g Term tivity J Emergency Plartningi and Response . <br /> mary, providing an overview of 8 Irreversible and Irretrievable K Traffic and Transportation <br /> the Draft EIS/EIR, is also avail- Commitment of Resources L PubficlnformationandIntergovem <br /> able as a separate document. 9 Growth-Inducing Impacts. ; mental Affairs <br /> IQLocal Projects Contributing tci M InWlhati6h Depositaries <br /> Cumulative Impacts N 1Vtitigation Monitoring1pr <br /> of Work on the Draft EIS/EIR <br /> began in October of 1990. Thirty- ® Public hearing, and BACKGRouND RBsouRCEs <br /> one principal authors worked over (continaed from front page) <br /> • Background information <br /> a period of 17 months gathering on the Draft EIS/EIR All nine locations contain a copy <br /> information, writing the Implem- are included in the U.S. Depart- of the Draft EIS/EIR, and back- <br /> entation Plan, Community Rela- ment of Energy Draft EIS/EIR ground information documents. <br /> tions Plan,and the Draft EIS/EIR. Notice of Availability published These documents include: LLNL <br /> of Following the 90-day public in the Federal Re „�'ster on Apri13, and SNL,Livermore Institutional <br /> 1992. Plans; LLNL Site Development <br /> comment period, the authors will and Facilities Utilization Plans; <br /> respond to comments received and Citizens and organizations may transcript of the November 15, <br /> take them into consideration dur- request a copy of the Executive 1990 Public Scoping Meeting; <br /> ing preparation of the Final EIS/ Summary or the entire Draft EIS/ 1991 Implementation Plan; 1991 <br /> EIR. EIR by calling BJ. Barringer at Community Relations Plan; and <br /> (510)373-8702 or toll-free at 1- copies of the first three flyers for <br /> ✓ Complete details on: 800-221-9005 (within northern this project. <br /> • Public comment period, California). <br /> Livermore Public Library and the <br /> COPIESALREADY DISTRIBUTED:. UC Berkeley Library, are also <br /> F U Draft EISWRil designated Reference Libraries <br /> F ,.State,and Local Agencies land Officials 123 with over 1,700 documents in <br /> Requests 76 their collections including:a copy <br /> Newpapen 12 of the Draft EIS/EIR, all refer- <br /> Lib=*es and Reading(Zooms I 1 <br /> Executive Summary Se+etion� ences cited,and all LLNL studies <br /> Requests 89 and reports reviewed by the con- <br /> TYand Radii, 5 sultants during preparation of the <br /> Project Information Flyers#11hrough#4 Approximately 6draft. 0 <br /> 80Q <br /> Release of Draft E/S/E1R Flyer April 1992 <br />