Laserfiche WebLink
Yes STOP <br />MONITOR WQGs <br />Yes STOP <br />RUNOFF' MET ? <br />IMPLEMENT MONITOR WQG <br />No PHASE 2 RUNOFF MET? <br />IMPLEMENT No <br />PHASE 1 <br />FS4 On Alternative <br />Control Measures <br />MONITOR <br />SURFACE WATER2 No Continue Surface Water <br />Monitoring Until Runoff <br />Meets WOG Negotiate Future <br />RUNOF Actions with <br />WQG CVRWOCB <br />MET? Yes e <br />Yes <br />Surface )M - <br />Water Meets <br />WQG or <br />BG5 <br />IMPLEMENT <br />1 Runoff = Storm Water Collected from Ditches and No PHASE 3 <br />Swales before it Enters the Main Channel <br />2 Surface Water = Water Contained in the Main Channel <br />3 WQG = Water Quality Goal, 7 MFL for Fibers Greater <br />than 10 microns in length PLATE <br />4 FS = Feasibility Study 6-3 <br />5 BG = Background © Kleinfelder.Inc. 1992 <br />Plate 6-3 <br />Drainage <br />Plan <br />Flow Chart, <br />Phases <br />1 <br />Through <br />Yes STOP <br />MONITOR WQGs <br />Yes STOP <br />RUNOFF' MET ? <br />IMPLEMENT MONITOR WQG <br />No PHASE 2 RUNOFF MET? <br />IMPLEMENT No <br />PHASE 1 <br />FS4 On Alternative <br />Control Measures <br />MONITOR <br />SURFACE WATER2 No Continue Surface Water <br />Monitoring Until Runoff <br />Meets WOG Negotiate Future <br />RUNOF Actions with <br />WQG CVRWOCB <br />MET? Yes e <br />Yes <br />Surface )M - <br />Water Meets <br />WQG or <br />BG5 <br />IMPLEMENT <br />1 Runoff = Storm Water Collected from Ditches and No PHASE 3 <br />Swales before it Enters the Main Channel <br />2 Surface Water = Water Contained in the Main Channel <br />3 WQG = Water Quality Goal, 7 MFL for Fibers Greater <br />than 10 microns in length PLATE <br />4 FS = Feasibility Study 6-3 <br />5 BG = Background © Kleinfelder.Inc. 1992 <br />