Laserfiche WebLink
KLEINFELDER <br /> TABLE OF CONTENTS (Cont.) <br /> ChapterZe <br /> 7 POSTCLOSURE MAINTENANCE PLAN 38 <br /> 7.1 Inspection and Maintenance 38 <br /> 7.2 Responsible Parties 38 <br /> 8 LINUTATIONS 39 <br /> PLATES <br /> 1-1 Site Vicinity Map <br /> 1-2 Site Location Map <br /> 2-1 WMU Locations <br /> 3-1 100 Year Flood Plain Map <br /> 4-1 Soil Sample Location Map, August 7, 1991 Investigation <br /> 4-2 Capping/Grading and Soil Remediation Areas <br /> 6-1 Phase I Drainage Plan <br /> 6-2 Phase II Drainage Plan <br /> 6-3 Drainage Plan Flow Chart, Phases I through III <br /> DRAWINGS <br /> 1 General Topography <br /> 2 Soil and Surface Water Sample Location Map and Analysis Key <br /> 3 WMU Site Topography <br /> 4 Final Grading Plan <br /> TABLES <br /> 3-1 Type and Size of J-M Mfg. WMUs <br /> 4-1 April 26, 1990 Soil Sampling Identification and Observation Log <br /> 4-2 April 26, 1990 Asbestos Soil Samples - Analytical Results <br /> 4-3 Summary of Analytical Results - Asbestos <br /> 5-1 Annual Precipitation for Stockton Airport <br /> 5-2 Annual Precipitation for Stockton Fire Station <br /> 5-3 Total Monthly Rainfall for Stockton Airport <br /> 54 Total Monthly Rainfall for Stockton Fire Station <br /> 5-5 100 Year Precipitation Events Summary <br /> 5-6 Evaporation At Mowry Bridge <br /> 5-7 Analytical Results Summary - Metals Analysis, Ground Water Samples <br /> 5-8 Analytical Results Summary - General Minerals Analysis , Ground Water Samples <br /> 5-9 Ground Water Field Parameters <br /> 5-10 Analytical Results Summary of Surface Water Samples <br /> 5-11 Summary of Surface Water Sampling Analytical Results, May 1991 <br /> 6-1 Landfill Cap Thickness Profile <br /> 6-2 Closure Schedule <br /> CR14-92-12 Page v of vi 24-220109-1709 <br /> I Copyright 1992 Kleinfelder, Inc. <br />