My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1992
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SPERRY
>
1051
>
4400 - Solid Waste Program
>
PR0504217
>
COMPLIANCE INFO_1992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2020 11:49:01 AM
Creation date
7/3/2020 10:35:01 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
1992
RECORD_ID
PR0504217
PE
4430
FACILITY_ID
FA0004231
FACILITY_NAME
J M EAGLE (WS)
STREET_NUMBER
1051
STREET_NAME
SPERRY
STREET_TYPE
RD
City
STOCKTON
Zip
95206
APN
17728039
CURRENT_STATUS
02
SITE_LOCATION
1051 SPERRY RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
CField
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4430_PR0504217_1051 SPERRY_1992.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 6-2 <br />Closure Schedule <br />J -M Manufacturing Co. <br />Task <br />Months Years <br />1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />1 <br />2 <br />3 <br />4 <br />WMU & Soil Remediation <br />Start of Project, <br />Prepare Final Design <br />(Based on Conceptual Design in RWD) <br />Prepare Bid Documents <br />Solicit Bids & Select Contractor <br />Soil Remediation, <br />WMU Capping, <br />Phase I Drainage <br />Drainage Plan Phase Implementation <br />Assess Performance of Phase I <br />Implement Phase II & Assess Performance', <br />Implement Phase III" <br />'lllf'lll�l'I'llll <br />I WDRs have been adopted, local agencies have accepted closure plan and have issued required permits. <br />D Only if performance of previous phase does not meet water quality goal. <br />III Phase 3 (replace channel with pipe) may occur after Phase 1 if surface water runoff is free of asbestos before reaching the channel, but waters in the channel contain asbestos in excess of the <br />water quality goal (or background, which ever is greater). The same can be said for implementation of Phase 3 after Phase 2. Phase 3 may not ever be implemented if the water quality goal is met. <br />
The URL can be used to link to this page
Your browser does not support the video tag.