Table 6-2 <br />Closure Schedule <br />J -M Manufacturing Co. <br />Task <br />Months Years <br />1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />1 <br />2 <br />3 <br />4 <br />WMU & Soil Remediation <br />Start of Project, <br />Prepare Final Design <br />(Based on Conceptual Design in RWD) <br />Prepare Bid Documents <br />Solicit Bids & Select Contractor <br />Soil Remediation, <br />WMU Capping, <br />Phase I Drainage <br />Drainage Plan Phase Implementation <br />Assess Performance of Phase I <br />Implement Phase II & Assess Performance', <br />Implement Phase III" <br />'lllf'lll�l'I'llll <br />I WDRs have been adopted, local agencies have accepted closure plan and have issued required permits. <br />D Only if performance of previous phase does not meet water quality goal. <br />III Phase 3 (replace channel with pipe) may occur after Phase 1 if surface water runoff is free of asbestos before reaching the channel, but waters in the channel contain asbestos in excess of the <br />water quality goal (or background, which ever is greater). The same can be said for implementation of Phase 3 after Phase 2. Phase 3 may not ever be implemented if the water quality goal is met. <br />