My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1992
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SPERRY
>
1051
>
4400 - Solid Waste Program
>
PR0504217
>
COMPLIANCE INFO_1992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2020 11:49:01 AM
Creation date
7/3/2020 10:35:01 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
1992
RECORD_ID
PR0504217
PE
4430
FACILITY_ID
FA0004231
FACILITY_NAME
J M EAGLE (WS)
STREET_NUMBER
1051
STREET_NAME
SPERRY
STREET_TYPE
RD
City
STOCKTON
Zip
95206
APN
17728039
CURRENT_STATUS
02
SITE_LOCATION
1051 SPERRY RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
CField
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4430_PR0504217_1051 SPERRY_1992.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
R <br />1 <br />DETENTlON ' • 1 DESIGN CALCUIATIONS <br />RUNOFF BASED ON 100 YEAR -24 HOURS HMNSITY,j <br />The surface area at the J—M site was divided into subareas and runoff from each <br />area was calculated based on the corresponding coefficient of runoff. <br />The total runoff was calculated for a maximum of five (5) hours during which time the intensity <br />is assumed to be the highest.The following table is a breakdown of the areas and runoff <br />associated with each area. <br />r� <br />I� <br />SUB—AREA CONTRIBUTING <br />TO RUNOFF (sq. ft.) <br />Coefficient of Runoff (C) hr <br />hr hr <br />hr <br />hr <br />For Different Areas: 1 <br />2 3 <br />4 <br />S <br />Area 1: C = OS 863,379.00 <br />Area 2: C = 0.5 <br />814,077.00 <br />Area 3: C = 0.8 <br />280,997.00 <br />Area 4: C = OS <br />386,562.00 <br />Area 5: C = 0.5 <br />10f,024.00 <br />Area 6: C = 0.8 <br />1,697,960.00 <br />Area 7: C = OS 1,082,834.00 <br />Total Runoff Area: 1,946,213 <br />814,077 280,997 <br />2,084,522 <br />101,024 <br />The rational method was used to calculate the runoff at the J—M site, using the <br />100 year, 24 hours event: <br />Runoff Flow Calculations <br />Area 1 <br />Area 2 Area 3 <br />Area 4 <br />Area 5 <br />Q=CiA, (cls) 5.41 <br />2.26 0.78 <br />5.79 <br />0.28 <br />Total Flow From North of the C; 698 (cfs) <br />125,681 <br />cubic feet % hr <br />Total How From South of the Q 10.83 (cfs) <br />195,030 <br />cubic feet / hr <br />Using Stoke's Law to calculate the settling velocity: <br />V = * <br />) / <br />[ (2ga**2) (dl—d2) (9n) <br />The following assumptions were made in calculating the settling <br />verity of the asbestos fibers: <br />a = radius <br />0.0000001 ft <br />dl = density of fiber (Crysotofite) <br />2.55 lb/ft**3 <br />d2 = density of runoff water (@ 20 deg. C) <br />62.43 lb/ft**3 <br />* <br />n = Coefficient of viscosity (@ 20 deg. C) <br />0.000673344 lb/(hr ft) <br />g = aceeleratio due to gravity <br />32.2 ft/sec**2 <br />Settling Volocity (V) : V = <br />—229E-03 (U), (velocity in <br />—y direction) <br />V = <br />—92M+00 (ft/h), (velocity in <br />—y direction) <br />r� <br />I� <br />
The URL can be used to link to this page
Your browser does not support the video tag.