My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1977-2017
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
RIVER
>
25100
>
4400 - Solid Waste Program
>
PR0504216
>
COMPLIANCE INFO_1977-2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2024 11:03:28 AM
Creation date
7/3/2020 10:35:02 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
1977-2017
RECORD_ID
PR0504216
PE
4430
FACILITY_ID
FA0006125
FACILITY_NAME
ESCALON CITY DUMP
STREET_NUMBER
25100
Direction
E
STREET_NAME
RIVER
STREET_TYPE
RD
City
ESCALON
Zip
95320
APN
24709015
CURRENT_STATUS
01
SITE_LOCATION
25100 E RIVER RD
P_LOCATION
06
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4430_PR0504216_25100 E RIVER_1977-2017.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
205
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Chapter 3, Subchapter 5, *les 1-4, Sections 20950-21430: Title dfCR, Div. 2, Subd... Page 1 of 2 <br /> 21190.CIWMB-Postclosure Land Use.(T14:Section 17796) <br /> (a)Proposed postclosure land uses shall be designed and maintained to: <br /> (1)protect public health and safety and prevent damage to structures, roads, utilities and gas monitoring and control systems; <br /> (2)prevent public contact with waste, landfill gas and leachate;and <br /> (3)prevent landfill gas explosions. <br /> (b)The site design shall consider one or more proposed uses of the site toward which the operator will direct its efforts,or shall show <br /> development as open space,graded to harmonize with the setting and landscaped with native shrubbery or low maintenance ground <br /> cover. <br /> (c)All proposed postclosure land uses,other than non-irrigated open space, on sites implementing closure or on closed sites shall be <br /> submitted to the EA, RWQCB, local air district and local land use agency.The EA shall review and approve proposed postclosure land <br /> uses if the project involves structures within 1,000 feet of the disposal area,structures on top of waste, modification of the low <br /> permeability layer, or irrigation over waste. <br /> (d)Construction on the site shall maintain the integrity of the final cover,drainage and erosion control systems,and gas monitoring and <br /> control systems.The owner or operator shall demonstrate to the satisfaction of the EA that the activities will not pose a threat to public <br /> health and safety and the environment.Any proposed modification or replacement of the low permeability layer of the final cover shall <br /> begin upon approval by the EA,and the RWQCB. <br /> (e)Construction of structural improvements on top of landfilled areas during the postclosure period shall meet the following conditions: <br /> (1)automatic methane gas sensors,designed to trigger an audible alarm when methane concentrations are detected,shall be <br /> installed in all buildings; <br /> (2)enclosed basement construction is prohibited; <br /> (3)buildings shall be constructed to mitigate the effects of gas accumulation,which may include an active gas collection or <br /> passive vent systems; <br /> (4)buildings and utilities shall be constructed to mitigate the effects of differential settlement.All utility connections shall be <br /> designed with flexible connections and utility collars; <br /> (5)utilities shall not be installed in or below any low permeability layer of final cover; <br /> (6)pilings shall not be installed in or through any bottom liner unless approved by the RWQCB; <br /> (7)if pilings are installed in or through the low permeability layer of final cover,then the low permeability layer must be replaced or <br /> repaired;and <br /> (8)periodic methane gas monitoring shall be conducted inside all buildings and underground utilities in accordance with section <br /> 20933 of Article 6,of Subchapter 4 of this Chapter. <br /> (f)The EA may require that an additional soil layer or building pad be placed on the final cover prior to construction to protect the <br /> integrity and function of the various layers of final cover. <br /> (g)All on site construction within 1,000 feet of the boundary of any disposal area shall be designed and constructed in accordance with <br /> the following,or in accordance with an equivalent design which will prevent gas migration into the building, unless an exemption has <br /> been issued: <br /> (1)a geomembrane or equivalent system with low permeability to landfill gas shall be installed between the concrete floor slab of <br /> the building and subgrade; <br /> (2)a permeable layer of open graded material of clean aggregate with a minimum thickness of 12 inches shall be installed <br /> between the geomembrane and the subgrade or slab; <br /> (3)a geotextile filter shall be utilized to prevent the introduction of fines into the permeable layer; <br /> (4)perforated venting pipes shall be installed within the permeable layer,and shall be designed to operate without clogging; <br /> (5)the venting pipe shall be constructed with the ability to be connected to an induced draft exhaust system; <br /> (6)automatic methane gas sensors shall be installed within the permeable gas layer,and inside the building to trigger an audible <br /> alarm when methane gas concentrations are detected;and <br /> (7)periodic methane gas monitoring shall be conducted inside all buildings and underground utilities in accordance with Article 6, <br /> of Subchapter 4 of this chapter(section 20920 et seq.). <br /> Note: <br /> Authority cited: <br /> Sections 40502 and 43020,Public Resources Code and Section 66796.22(d),Government Code. <br /> Reference: <br /> http://www.calrecycle.ca.gov/Laws/Regulations/Title27/ch3 sb5.htm 8/27/2010 <br />
The URL can be used to link to this page
Your browser does not support the video tag.