Laserfiche WebLink
STATE OF CALIFORNIA GEORGE DEUKMEJIAN, Governor <br /> CALIFORNIA WASTE MANAGEMENT BOARD <br /> 1020 NINTH STREET, SUITE 300 ; <br /> SACRAMENTO, CA 95814 <br /> iMAR 6 1985 <br /> Sfa ' 4J s� , d <br /> J.M. Corporation ,"✓C? <br /> PO Box 1587 � <br /> Stockton, CA 95201 ' , <br /> Attn: Cecil Bonzo <br /> Subject: J.M. Corporation Landfill 39-AA-13 <br /> Gentlemen: <br /> The California Government Code requires all solid waste facility <br /> permits to be reviewed at least every five years. Your local <br /> Enforcement Agency (LEA) has designated your Solid Waste Facility <br /> Permit for review during the next five months . The California <br /> Administrative Code requires that the owner or operator shall <br /> cause a registered civil engineer to review the site design and <br /> operation plan to determine if any revisions are necessary and to <br /> estimate the remaining site life. The conclusions and <br /> recommendations of the engineer 's review shall be presented in a <br /> report and filed with the LEA and the California Waste Management <br /> Board (CWMB) . <br /> Should the engineering review determine that an adequate design <br /> or operation plan does not exist, you must amend your Report of <br /> Disposal Site Information. This report would be prepared by a <br /> registered civil engineer, supplying any required additional <br /> information. The reports would then be submitted to the LEA and <br /> the CWMB for review. <br /> Should the engineering reviewow as er . hne that a.^4 <br /> adequate design <br /> and operation plan does exist, you must submit the engineering <br /> report to the LEA and the CWMB for review and the re-issuance of <br /> your Solid Waste Facility Permit . <br /> If your facility began operation prior to August 15, 1977, you <br /> may have a "grandfathered" facility permit under California <br /> Government Code Section 66796 . 30 . In this case, you may not have <br /> provided a site design or operation plan with your permit <br /> application at that time. If you did not, you need to prepare <br /> and submit a Report of Disposal Site Information now. The Report <br /> of Disposal Site Information contains information on the site <br /> design and operation plan. <br /> The attached Engineering Report Requirements document should be <br /> used as the basis or the engineering review. The disposal site <br />