My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1974- 1984
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SPERRY
>
1051
>
4400 - Solid Waste Program
>
PR0504217
>
COMPLIANCE INFO_1974- 1984
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2020 11:54:02 AM
Creation date
7/3/2020 10:35:09 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
1974- 1984
RECORD_ID
PR0504217
PE
4430
FACILITY_ID
FA0004231
FACILITY_NAME
J M EAGLE (WS)
STREET_NUMBER
1051
STREET_NAME
SPERRY
STREET_TYPE
RD
City
STOCKTON
Zip
95206
APN
17728039
CURRENT_STATUS
02
SITE_LOCATION
1051 SPERRY RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
CField
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4430_PR0504217_1051 SPERRY_1974-1984.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
306
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Antonia Vorster -4- 21 October 1987 <br /> Potentially, stormwater could be combined with PVC blowdown water if discharge <br /> of blowdown water to ponds is allowed. J/M could create a new pond or refur- <br /> bish the two existing ponds. <br /> To prevent raw materials from the PVC process from entering the on-site ponds <br /> and creating a potential ground water pollution probem or TPCA site, J/M <br /> should develop a Spill Contingency Plan. <br /> SUMMARY <br /> J/M should submit a closure plan that addresses the following items: <br /> 1. Ground Water Monitoring for on-site Landfills <br /> Landfill closure requirements will be based on results of this monitoring. To <br /> avoid future work, the monitoring program should meet Calderon Requirements. <br /> Staff also recommends that permanent boundry markers be installed at all <br /> existing landfill sites. A copy of the Calderon guidelines are attached. <br /> 2. Existing Ponds <br /> Analyze pond sludge for TDS and general minerals using WET methodology with <br /> deionized water. Develop a closure strategy and time schedule for implementa- <br /> tion. Ground water monitoring wells should be considered. <br /> 3. Soils <br /> Develop a procedure and time schedule for addressing asbestos containing soils <br /> on-site. This procedure should be submitted to DHS and Regional Board staff <br /> for review. <br /> 4. Ongoing Operations <br /> J/M should indicate its preference for stormwater and 'PVC blowdown discharge. <br /> Off-site discharge to Little John Creek will require an NPDES permit and <br /> monitoring. <br /> On-site pond disposal of PUC blowdown water will require the following infor- <br /> mation to assess its impact and acceptability. <br /> o File a Report of Waste Discharge. <br /> o Determine background water quality. <br /> o Determine volume, chemical characterization and variability of blowdown. <br /> Analyses should include TDS, metals (use AA), general minerals, priority <br /> pollutants, and oil and grease. <br />
The URL can be used to link to this page
Your browser does not support the video tag.