Laserfiche WebLink
WATER SUPPLY MONITORING <br /> A sampling station shall be established where a representative sample <br /> of the municipal water supply can be obtained® The following shall, <br /> constitute the water supply monitoring program: <br /> Constituent Units - Sampling Frequency <br /> Standard Minerals mg/l Yearly at same time as ef- <br /> fluent samples <br /> Specific Conductivity Micromhos/cm Yearly at same time as ef- <br /> @ 250C fluent samples <br /> Total. Dissolved mg/l Yearly at same time as ef- <br /> Solids fluent samples <br /> REPORTING <br /> In reporting the monitoring data, the discharger shall arrange the <br /> data in tabular form so that the date, the constituents, and the con- <br /> centrations are readily discernible® The data shall be summarized in <br /> such a manner to illustrate clearly the compliance with waste dis- <br /> charge requirements® <br /> Monthly monitoring reports shall be submitted to the Regional Board by <br /> the 15th day of the following month® <br /> If the discharger monitors any pollutant at the locations designated <br /> herein more frequently than is required by this order, he shall in- <br /> clude the results of such monitoring in the calculation and reporting <br /> of the values required in the Discharge Monitoring Report Form® Such <br /> increased frequency shall be indicated on the Discharge Monitoring <br /> Report Form® <br /> Ordered by <br /> JA__MESA. ROBERTSON, Executive Officer <br /> Date <br /> 3/16/74 dla/ca e 2 - <br />