Laserfiche WebLink
-2 - <br />upstream of our discharge site would be destroyed. There is animal <br />life at our discharge sites and -downstream. <br />WATER SUPPLY MONITORING <br />We do not utilize a municipal water supply. Our water supply comes <br />from our own wells. The quality of our well water would be identi- <br />cal to that of waste discharge from site 001. <br />s <br />Copies of reports from an independent testing laboratory are attach- <br />ed. <br />We have previously written you requesting a modification in frequency <br />of monitoring as follows: <br />Requested Frequency <br />1. Suspended Matter Semi-annually <br />2. Settleable Matter Semi-annually <br />3. Total Dissolved Solids Semi-annually <br />4. pH Value Semi-annually <br />5. Temperature Quarterly <br />6. Flow Quarterly <br />With this submital of current water discharge quality, we again re- <br />quest that the above modifications be granted. The quality of our <br />discharges are within the tolerances required by your agency. We do <br />not foresee any significant changes in the quality of our well water <br />or our discharges. The existing requirements for bi-weekly monitor- <br />ing of items 1 through 4 above,'constitute a considerable added cost <br />to our operation which we feel is unnecessary in view of the quality <br />of our discharge water. <br />Yours truly, <br />W. E. Volwiler <br />Plant Manager <br />WEV/CPB/dg <br />ATTACHMENTS <br />cc: Regional Administrator <br />E. P. A. <br />Region IX <br />100 California Street <br />San Francisco, CA. 94111 <br />D. Appeldorn, Staff Eng., E. J. Mitchell, Denver, Colo, <br />J. N. Siegfried, Dvr., Colo, N. R. Fratantuono, Dvr., Colo, <br />S. S. Uralli, C. P. Bonzo <br />