Laserfiche WebLink
a <br /> May 1989, which required it to "submit a workplan for permanent mitigation of the <br /> hazards posed by the presence of asbestos at the site" (2). The Responsible Party (RP) <br /> was believed to have installed a permanent cap at the site in 1991, mitigating any hazard <br /> posed by the asbestos debris piles (19). <br /> URS Consultants, Inc. Page 2 <br />