Laserfiche WebLink
URS Corporation <br />2870 Gateway Oaks Drive, Suite 150 nitoring Well Sampling Data <br />Sacramento, CA 95833 Phone: (916) 679-2000 <br />Project: World Enterprises <br />Job No.: <br />Location No.: W – 0 r-37 _ <br />Sampling No(s): _yo w –03 — -S Sampled By: _,i -r /tic c� <br />Sample Date: /j o Reviewed By: Date: <br />Sampling Method: ,7e <br />A Weather: tioa/Y <br />Sampling times(s): ® Ambient Temp.: (oF) 60 <br />WATER ELEVATION DATA // <br />Method of Measurement: Depth Sounder M Yes 0 No <br />Other: <br />1) Depth to Water Surface (DTW) w2 2.2%) ft <br />.12 <br />2) Total Depth of Well ft <br />(from casing top as marked) <br />3) Height of Water Column (H) ft <br />TD-DTW = H <br />WELL PURGE AND SAMPLING DATA h/ <br />Single Casing Volume of Water in Well (VW) <br />(CV X H = VW) <br />Number of Casing Volumes to Purge (NC) <br />Total Volume of Water to Purge (TV) <br />(VW X NC = TV) <br />Purge Method: <br />Start of Purge (Date/Time): / U <br />Was Well Pumped Dry? 0 Yes No <br />WATER ELEVATION DATA <br />Date of Measurement: <br />Method of Measurement: " -rd w <br />Depth Sounder No: fi l'/y9G <br />(1) DTW <br />(2) TD <br />Water Surface <br />Or Packer <br />(3) H <br />k] <br />Casing Top <br />Casing Bottom <br />Well Diameter (in) Volume/Lineal ft. (V) (gal/ft) <br />C„a� 0.163 <br />3 0.3167 <br />4 0.652 <br />5 1.02 <br />D CV = (23.49) x [D/24)] x H <br />CV = 7r [(D/2)/12 in/ft]2 h (7.48 gal/cu. ft) <br />Time Temp Cond. r Turbidity Removed Flow Water Physical <br />°C r'091 <br />/ pH* (NTU)" (gal) Rate(gpm) Le els Appearance <br />&; /Ca /� S r 4 ell <br />4:7_ <br />104 <br />COMMENTS (Record additional purging and <br />*Instrument Number.l'r -4.4 9—/0 4100— <br />remarks / observations on back) <br />-Turbidity Meter No.: _">�qkw <br />Record parameters three times per well casing volume. Indicate the sample time, total purge volume and water level reading as the last row of parameter readings. <br />Note: The final row of readings should list the time sampling was completed and an estimate of the total volume of water removed. Water measurements should be recorded at each well casing <br />volume. In the observations field, note which reading applies to the values recorded at sampling. <br />