My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_FILE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
2441
>
4400 - Solid Waste Program
>
PR0526162
>
COMPLIANCE INFO_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2020 2:37:20 PM
Creation date
7/3/2020 10:39:05 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
FILE 1
RECORD_ID
PR0526162
PE
4430
FACILITY_ID
FA0004701
FACILITY_NAME
TEICHERT PRECAST STOCKTON
STREET_NUMBER
2441
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16334009
CURRENT_STATUS
02
SITE_LOCATION
2441 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
CField
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4430_PR0526162_2441 W CHARTER_FILE 1.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I V. Surface Condit-i* <br /> A. Is site access adequately restricted?6–A) <br /> B Is fhn waste adequately covered to prevent human contact? <br /> C. I he final drainage system for the site adequate to prevent erosion? <br /> D. Is the final grading adequate to promote run-off? (9N) <br /> E. Are slopes greater than 3:1 (33% or 18 degrees)? (YO <br /> F. Are slopes greater than 1.75:1 (57% or 30 degrees)? (YQ <br /> V. Postclosure Land Use <br /> A. Has the land use of the site significantly changed since closure? <br /> If yes, include or reference site improv ent plans and answer the following: <br /> 1. Give the date that the improvements were constructed int <br /> 2. Have the improvements compromised the integrity of the final <br /> cover? (Y A) 0 <br /> 3. Has differential settlement affected the improvements? (Y/N) <br /> B. Is there a proposed change in postclosure land use that may jeopardize <br /> the integrity of previously closed sites or pose a potential threat to public <br /> health and safety or the environment? (Y/N) <br /> If yes, briefly describe the proposed project: <br /> C. Is there a postclosure land use tracking system? (Y/N) <br /> If yes, describe tracking system: <br /> V1. Disposal Site Priority (See Prioritization Chart) <br /> A1: A2:_A 3:_ B1: B2:_—B 3:_ C1: C2:ZC 3:_ D:_ <br /> VII. Comments <br /> PREPARED BY: DATE: 6- fl <br /> COMPLIANCE BRANCH REVIEW: <br /> CIWMB CLOSURE AND REMEDIATION BRANCH APPROVAL <br /> Page 4 of 4 <br /> C1WMB Closure and Remediation Branch(1/25/93) <br />
The URL can be used to link to this page
Your browser does not support the video tag.