Laserfiche WebLink
2441 W,Charter Way Page 3 <br /> Work Plan—Soil Boring Installation <br /> ' GPE Project No.667.2 <br /> June 21,2013 <br /> The regulatory status of the site is such that the landfill area my not have structures <br /> constructed on it. If any new structures are proposed within 1,000 feet of the landfill <br /> area, or if the land use is changed, restrictions imposed by State law (27-CCR-21190) <br /> must be adhered to. The site is also bound by State law 27-CCR-21200 regarding any <br /> change of ownership. The local planning agency must be notified so they may assess the <br /> need for addition safety measures. Such measures would be likely to include such things <br /> as vapor barriers under buildings and permanent methane monitoring devices. The <br /> alternative would be to complete additional investigations of the landfill to better <br /> determine its extent, contents, and the risk that hazardous chemicals such as methane <br /> could be present or could migrate to affect inhabited spaces. CalRecycle also periodically <br /> inspects the land to verify that the landfill cap remains undisturbed and that the natural <br /> vegetation growing on it is kept under control. <br /> 2937 Veneman Ave.,#B240 Geo-Phase Environmental Inc. Phone(209)569-0293 <br /> Modesto,CA 95356 Fax(209)569-0295 <br />